Search Forum
Filters:
Page# 675909 Blog Entries next>>
Thank you ECR n Danapur Division for atleast bringing this improvement in KIUL.This was much needed in such a busy junction.
3 hi platform pe lage hai bhai
Lekin thik hai kuch toh kar rha DNR Division
Lekin thik hai kuch toh kar rha DNR Division
Trip Started: Thu May 09 by SamSinghChauhan
0 | updating ... |
Finally Reaching KIUL, now wait for next part too
12 Posts
Train acchi hai lekin patna ka arrival time shi nhi hai. Aur ab Patna aa bhi nhi payegi kabhi time. Pe. Patna aane k liye shayad hi log ab isko prefer marenge. Raat k 12.30 bje kon Deboard krega patna mein. Isiliye Occupancy v ght gyi hai iski bhut .
Ye cheese Maine bhi notice ki hai, isko passengers I think, MKA, KIUL,JMP n BGP se hi milte hain..baki stations se mushkil se 3-4
New/Special Trains
ECR/East Central
mjgupta0~ 1 news posts
उतरीछोटा नागपुर प्रमंडल का मुख्यालय और ऐतिहासिक जिला हजारीबाग के लोग कई दशकों से रेल लाइन के लिए तरसते रहे थे, लोगों के लिए रेल एक...
4 Posts
Koi interested hi nahi hai HZBN ko long distance train dene ke liye na ecr na ser na yaha ke neta...
देखिए इस समस्या का समाधान बेहद सरल है बशर्ते कि कोई इसे प्रमुखता से उठाए और वो है 22409/22410 आनंद विहा(ट) - गया गरीबरथ एक्सप्रेस का गया से कोडरमा, हज़ारीबाग़ टाउन पर ठहराव देते हुए बरकाकाना तक रूट विस्तार।
Adittya uss train ko ECR Dhanbad tak extend nahi kar raha hai aur tumhe lagta hain Dhanbad Division ke dusre station ko yeh train denge ?
02877/78 ranchi anvt special should have gone via rnc brka hzb..route
A connection should be made to avoid LR at BRKA and a Y connection at KQR.
ECR should step ahead with a proposal of a new train between HWH & HZBN.
ECR should step ahead with a proposal of a new train between HWH & HZBN.
Eastern DFC Son Nagar to Andal Multi Tracking Project...
New routes indicated for Nawada, Chatra, DaltonGanj, Bihta, Aurangabad,
So far no connection shown with kiul Gaya line. Have a look😳
New routes indicated for Nawada, Chatra, DaltonGanj, Bihta, Aurangabad,
So far no connection shown with kiul Gaya line. Have a look😳
If the train's PM shifted to NR, What will be the new train number ?
Also the train should bypass ED , that would save lot of time.
Also the train should bypass ED , that would save lot of time.
Erode can be bypassed, the train can be speed up by 3hrs from Vijayawada to New Delhi on both directions it has less stoppages., total 4 hrs running time can be reduced
Find out which series of 124, 224, 204 number slots are free
22489/90 to 22495/96 number slots are free. 20417/18 to 20449/50, 20453/54 to 20469/70; 20477/78, 20479/80; 20493/94 & 20495/96 number slots are empty.
22489/90 to 22495/96 number slots are free. 20417/18 to 20449/50, 20453/54 to 20469/70; 20477/78, 20479/80; 20493/94 & 20495/96 number slots are empty.
Page# 675909 Blog Entries next>>