Search Forum
Filters:
Page# 677265 Blog Entries next>>
WR/Western
riz339~ 341 news posts
અસારવાથી હિંમતનગર રેલવે લાઈન પર ઈલેક્ટ્રીફીકેશનની કામગીરી પૂર્ણતાનાં આરે છે. ચૂંટણીને લઈને અટકેલી કામગીરી શરુ થઇ છે જેને લઈને અગામી દિવસોમાં CRS થવાની સંભાવના છે. જેને...
Finally Jolarpettai Junction - Krishnagiri - Hosur Railway line is to be construed by Southern Railway Zone. By the way Morappur - Dharmapuri Railway line will also comes under Southern Railway Jurisdiction.
The electrification works were going on in these railway lines (except Tiruvarur - Karaikkudi Railway line). Admin please update the Walaja Road Junction - Ranipet Railway line as under Electrification and mark the station as Siding Station to Industries.
If we compare its TT with Konark Exp TT then halt at vskp can be given very easily. Might need 10-20 minutes but it can be possible and very much needed.
There is slack time in VJA Gudur Section for 1+hr and Vskp can be accommodated, but the problem is there is no incoming and outgoing slot at Vskp with the present timings of the train in both directions. Timings of 2-3 trains need to be changed. One more problem.is continous arrival and deps at Vskp with 10 mins difference it effecting punctuality of trains.
Page# 677265 Blog Entries next>>