Search Forum
Filters:
Apr 25 (10:47) 07338/Guntakal - SSS Hubballi Passenger Special (UnReserved) | BYC/Ballari Cantt. Halt (Bellary) (2 PFs)
SteelCityRF^~
SteelCityRF^~ 27548 blog posts07338 - Guntakal - SSS Hubballi Passenger Special arriving at #Ballari Cantonment Halt on #March17th2024
This train was hauled by Valsad (BLEE) WAG-9HC #43540 i.e., mega offlink
Enjoy shrill electric loco...
more...
This train was hauled by Valsad (BLEE) WAG-9HC #43540 i.e., mega offlink
Enjoy shrill electric loco...
more...
More Posts
A freight train (BOXNS wagons) skipping #Ballari Cantonment Halt on #March17th2024
This freight train was hauled by Erode (EDE) WAG-7 Twins i.e., #27436 and #27906
Enjoy electric loco horn
...
more...
This freight train was hauled by Erode (EDE) WAG-7 Twins i.e., #27436 and #27906
Enjoy electric loco horn
...
more...
More Posts
Mar 06 (07:28) 12797/Venkatadri SF Express (PT) | SC/Secunderabad Junction (10 PFs)
RoyalIndianRailways
RoyalIndianRailways 466 blog postsSoon one more historical train ICF chapter going to close
Devotees train of scr ,1st train between hyderabad and Tirupati. Legendry Venkatadri express getting lhb soon
Devotees train of scr ,1st train between hyderabad and Tirupati. Legendry Venkatadri express getting lhb soon
2 Posts
good to see this. But 12785 also needed LHB rakes and which is also most prestigious train in scr as well as in kcg-sbc route
What is the composition of new rake? Can you tell if you have observed it
1 Posts
After Cansaulim Majorda gets commissioned 37 kms (Cansaulim to Kalem) out of total 58 kms will be a double line on Vasco Kulem route.
Also Kalem to Kulem I think some forest clearances are pending that's why works not started except Kulem outers if it starts can be commissioned within 6 months as terrain is not too difficult and no houses near the tracks the entire track passes through forest.
Also Kalem to Kulem I think some forest clearances are pending that's why works not started except Kulem outers if it starts can be commissioned within 6 months as terrain is not too difficult and no houses near the tracks the entire track passes through forest.
1 Posts
Is There Plan To Extend This Vasco Majorda 2nd Line Upto Madgaon Jn And Then Change The Allignment Of This Line Towards Left Going To Kulem
I don't think so. They will use the existing tracks as double line from Majorda to Madgaon.
another thing is that the pf no 2 loop line ends at mao end at the existing down line which which is used as up line by both kr swr at that time many trains going towards rn block the existing down main line so suppose if a train coming from vsg comes at mjo outers and that train will halt at mjo outers for clearance cuz rn mao line is used as down main line by kr swr so how kr swr will solve this problem
Today (17:02) 12403/Prayagraj - Bikaner SF Express (Via Fatehpur Shekhawati) (PT) | PRYJ/Prayagraj Junction (Allahabad) (10 PFs)
WAP7NFRMLDT~
WAP7NFRMLDT~ 504 blog postsThe name of this train should be changed to "Experiment Express"🤣🤣
Railways started experimenting with this train in this way
2007: It was introduced as Prayagraj mathura Express. Later it got extended...
more...
Railways started experimenting with this train in this way
2007: It was introduced as Prayagraj mathura Express. Later it got extended...
more...