Search Forum
Filters:
Today (09:35) 14113/Subedarganj - Dehradun Express (PT) | CNB/Kanpur Central (10 PFs) | GMO/WAP-7/37545
bsbssf01
bsbssf01 605 blog postsYesterday, Newly Attached A2 Coach suffered a AC Failure after departure from Subedarganj.
Coach was replaced at Kanpur Central
Coach was replaced at Kanpur Central
Today (09:38) 12510/Guwahati - SMVT Bengaluru SF Express (PT) | GHY/Guwahati (7 PFs)
abdulrazzak123
abdulrazzak123 52 blog postsBBS- VSKP section will be upgrade speed from 110 kmph to 130 kmph by conducting COCR into 2 phases.
1)RLJC- KUR - PSA (present phase)
2) PSA- VSKP (next phase)
Source: respective owner
1)RLJC- KUR - PSA (present phase)
2) PSA- VSKP (next phase)
Source: respective owner
31 Posts
ECoR will be constructing a Steel Truss Box-Girder Bridge on Vamsadhara River. Current Bridge is not fit for 130 kph MPS
Trip Started: Wed Apr 17 by Deepanjan^~
0 | updating ... |
Now it's time to return home after a memorable Hyderabad and Vizag Trip.
309 Posts
Akta cab peye gechilam. Ratre ultopalta charge kore. Er tao reasonable chilo. Besi late hoyni.
আমি বাবাকে রাত 11:25 এর যোধপুর এক্সপ্রেসে ছাড়তে গিয়েছিলাম আর আমি যাত্রী সাথি অ্যাপের মাধ্যমে বুক করি। তাতে আমি বাড়ি ফিরে আসি রাত সাড়ে বারোটায়।
ECoR will be constructing a Steel Truss Box-Girder Bridge on Vamsadhara River. Current Bridge is not fit for 130 kph MPS
ECoR will be constructing a Steel Truss Box-Girder Bridge on Vamsadhara River. Current Bridge is not fit for 130 kph MPS
12029 departed on time at 07:20 today (07.05.2024) from NDLS even though yesterday's 12030 arrived at 08:15. Which spare rake are they using?