Search Forum
Filters:
Apr 23 (22:46) 11448/Shaktipunj Express (PT) | BEHR/Beohari (3 PFs)
CrazyTraveller~
CrazyTraveller~ 3529 blog postsOn April 22, Commissioner Railway Safety (CRS) inspection was successfully completed between the Vijaysota-Chhataini-Beohari sections under the Katni-Singrauli Doubling Project in Jabalpur Division.
Yesterday (08:46) 15658/Brahmaputra Mail (PT) | KIUL/Kiul Junction (8 PFs) | BRC/WAP-7/37583
GHAZIABAD_WAP7^~
GHAZIABAD_WAP7^~ 9059 blog posts15658 KYQ DLI Brahmaputra Mail Arrived Kiul Jn With 37583 BRC WAP-7
yesterday's pics
yesterday's pics
India’s first AC railway station: where did they go wrong?
Sir M Visvesvaraya Terminal (SMVT) is India's first centrally air conditioned railway station, designed to look like an airport.
South Western Railways...
more...
Sir M Visvesvaraya Terminal (SMVT) is India's first centrally air conditioned railway station, designed to look like an airport.
South Western Railways...
more...
Regarding the reach to this stn is now working out fine... cause I recently visited the stn and u have seen the pics shared there.... it's crowded and there r metro feeder buses to and fro SMVT... proper connecting roads r there to this stn.... so I don't find this a huge problem... this is what I've observed....
W.r.t. other points mentioned in the group, IMO they're trying to get the building that fall under the Amrit Bharat Scheme in terms of the modernisation of the stns.... but yes I've seen some...
more...
W.r.t. other points mentioned in the group, IMO they're trying to get the building that fall under the Amrit Bharat Scheme in terms of the modernisation of the stns.... but yes I've seen some...
more...
Clear example of how not to design.
YPR Hosur line on the outer periphery (Benniganahalli overhead line) could have been connected with a C or U link to SMVT, so that Hosur line gets connected to Yelahanka and KJM line (without loco reversal).
If this was made, trains could have moved from Hosur to Chennai or Salem to Hyderabad via SMVT DMM route.
It...
more...
YPR Hosur line on the outer periphery (Benniganahalli overhead line) could have been connected with a C or U link to SMVT, so that Hosur line gets connected to Yelahanka and KJM line (without loco reversal).
If this was made, trains could have moved from Hosur to Chennai or Salem to Hyderabad via SMVT DMM route.
It...
more...
Today (10:02) 19812/Etawah - Kota Express | DO/Dausa (2 PFs)
MAHAWARROHAN59
MAHAWARROHAN59 47 blog postsमैं आप सभी से पूछना चाहता हूँ की, Train No. 19812/19811 Etawah - Kota - Etawah Express, जो की Kota junction पर 16 hours, 45 minutes तक खड़ी रहती है,
तो क्या Railway इस ट्रेन के LIE over और Rake को उपयोग में लेते हुए है, एक नयी train बनाकर Kota से Dausa के बीच चला सकता है क्या ?
क्योंकि Kota से Dausa के बीच में अभी train available भी नहीं है।
तो क्या Railway इस ट्रेन के LIE over और Rake को उपयोग में लेते हुए है, एक नयी train बनाकर Kota से Dausa के बीच चला सकता है क्या ?
क्योंकि Kota से Dausa के बीच में अभी train available भी नहीं है।
KZJ WAG 7 MU -- 27361 & 27853 leading a CONCOR rake, going on towards Tatanagar Junction
More Posts