Search Forum
Filters:
Today (18:46) 13152/Jammu Tawi - Kolkata Express | PTKR/Patipukur (1 PFs) | BSL/WAP-4/22981
RupamDey37481~
RupamDey37481~ 181 blog postsLHB + Conventional Combo after a long time in a frame DN Jammutawi Kolkata Express approaching Patipukur and moving towards its final destination Kolkata Terminus with EX Itarsi now BSL Bhusawal WAP4 22981
Yesterday (14:53) 01065/Mumbai CSMT - Agartala Special Fare Summer Specialinvisible_me^~ 581 blog posts
Have you seen more delay then this in any train. Why does railway even operate these trains.
16 Posts
Very useful and interesting info regarding delay of Indian Railways and the most interesting was 13006 overtaking itself 😂. I had one similar instance back in 2016. My northeast 125060 express came 27 hrs delayed at kanpur and the real Northeast was 4 hours behind our train, however we didn't face the overtake till my destination KIR.
I think this is not possible that a train overtakes it self of one day previous departure😶😶😶How can railway make such mistake 🥲
It can happen if current day train is on slot and previous day train is highly off slot. Isn't it normal??If trains get delayed by any chance a high priority train can also be looped for on slot trains.
Yes you are right bro bt i think this is not possible to overtake same train 🥲🥲🥲
1 Posts
It's a humble request to @drmpune @kgprail @drmhowrah @drmngpsecr @drmcrngp @DRMBilaspur @drm_raipur @RailMinIndia to cancel 12129/30 Howrah Pune Azad Hind express for a week and then freshly start this train on time. And when you lhbfy it, use 3 rakes,2 for regular,1 spear rake click here
After few days same delay will start again to this train.... Railway should now arrange a extra rake to this train for ontime departure from both direction.. Only this is the solution
Today (19:24) KOPR/Kopar (4 PFs) | SRE/WAG-12B/60017
ForeverRailfan^~
ForeverRailfan^~ 53292 blog postsAlstom Built SRE WAG12B Hauling Steel coil on GATX BFNV Rake
click here
Built by ALSTOM Saharanpur Electric Loco Shed (SREE) Homed WAG-12B #60017 Fitted with Faiveley LX3600 Single Arm Rapid Transit HR Pantograph on both units powering Steel coils on GATX BFNV Rake skipping Kopar.
click here
Built by ALSTOM Saharanpur Electric Loco Shed (SREE) Homed WAG-12B #60017 Fitted with Faiveley LX3600 Single Arm Rapid Transit HR Pantograph on both units powering Steel coils on GATX BFNV Rake skipping Kopar.
Trip Started: Sun May 12 by DreamTrip22503^~
ON TRIP........
TRIP PART NO...... 3
RESERVATION charting done
End to End
current Availability is there in ALL classes
End to End
current Availability is there in ALL classes
Our Train is Rescheduled....
04715 Pairing Rake is Running delayed by 1hour 15 minutes delayed
Expected to Arrive here Around 20:15 pm
Running status of Pairing Rake
04715 BKN - SNSI special..
it has slack time in between ( Manmad & sai Nagar shirdi ) Expected Arrival time 20:15 pm