Search Forum
Filters:
Today (11:37) 07658/SSS Hubballi – Tirupati Special Fare Special | BAY/Ballari Junction (Bellary) (4 PFs)
SteelCityRF^~
SteelCityRF^~ 27594 blog posts07658 - SSS Hubballi - Tirupati Express Special was captured near #Ballari Junction on #May1st2024
This train was hauled by Guntakal (GTLE) WAG-7 #27626. This loco had conventional shell
Enjoy electric...
more...
This train was hauled by Guntakal (GTLE) WAG-7 #27626. This loco had conventional shell
Enjoy electric...
more...
More Posts
Today (12:15) 12863/Howrah - SMVT Bengaluru SF Express (PT) | HWH/Howrah Junction (23 PFs)
Anubad_008^~
Anubad_008^~ 5306 blog postsRake standardization of these trains. RSA will happen between these trains!
1 Posts
phle se hi nark bana rkha h howrah nagpur route ko aur upar se 12809/10 se 2 sleeper coach kam kr rhe h
Not rsa
Any train late which ever rake available then late train will depart on time
Any train late which ever rake available then late train will depart on time
1 week se jyada ho gya har din 12129/30 12261/62 12221/22 18029/30 har din late kar rha hai ye ser zone
Guys Suggest me How can I Get A Confirm Ticket In Purushottam Express On 5th June 2024 in 3Rd Ac or 2Ac without Any Tatkal Interference Any Idea ??
3 Posts
click here
Eastern Railway got 158 coaches from MCF, 6 coaches from RCF for normal trains from January 2024 till today . All coaches are of each class like Sleeper , 3AC, 2AC, 1AC, 3E etc.
Hence this year we might see huge LHBfication of ER trains
Eastern Railway got 158 coaches from MCF, 6 coaches from RCF for normal trains from January 2024 till today . All coaches are of each class like Sleeper , 3AC, 2AC, 1AC, 3E etc.
Hence this year we might see huge LHBfication of ER trains
11 Posts
Yes, NFR received 64 from RCF + 3 from ICF & 3 From MCF. Most long distance trains of NFR are LHB , I think they will increase frequency of some trains
Out of these 84,500 coaches around 72,000 coaches are in use and the coaches produced in 2001,02 03 ICF are out of service as they have completed 20yrs of service. The plants have completed shifted to LHB production from 1st April 2018 and in these 6 years how many LHB coaches are manufactured.
That I have to work and tell and ECoR VSKP Still have old v aches in use till day as i know
More Posts
The Railways on Monday rejected media reports about alleged move to close down the Palakkad Division, saying that they were “entirely speculative” and “devoid of factual...
read more... No plan to close Palakkad division: Railways
Fully neglected stations under Palakkad division. Should be closed down and merged with some other division. Shornur to Mangalore has not enough local trains and public is suffering.