Search Forum
Filters:
Page# 671592 Blog Entries next>>
31401 BIA WAG 9Hi with a mixed rake at Tatanagar Yard Line.
More Posts
Today (19:38) 22642/Shalimar - Thiruvananthapuram Central SF Express (PT) | ERS/Ernakulam Junction (South) (6 PFs) | BZA/WAP-7/39155
SreenathSree^~
SreenathSree^~ 8227 blog postsAcknowledged with headlights ON.
PLW assembled SCR BZA WAP 7 39155 looping out ERS with SR 22642 SHM- TVC Superfast Express
Ernakulam Jn (ERS), Southern Railway (SR)
PLW assembled SCR BZA WAP 7 39155 looping out ERS with SR 22642 SHM- TVC Superfast Express
Ernakulam Jn (ERS), Southern Railway (SR)
More Posts
Today (16:04) 16734/Okha - Rameswaram Weekly Express (PT) | DG/Dindigul Junction (5 PFs) | RPM/WAP-7/30357
sivaprakashofficial^~
sivaprakashofficial^~ 5663 blog postsMore Posts
Ecor proposal diya hai iska route via - SBPY - JSG-ROU pe divert karne ke liye.
Yes better then interior route for connectivity of SBP Rourkeka and should be made triweekly. Return from Taranagar should be in afternoon to suit the timings or alternate to Tata Allepey.
This train in down line gets too much rescheduled, this train should be extended to Hyderabad and it can be possible because its time slot matches with 22850 and 12774. Should be controlled by Tata SER.
Or inplace of doing such things why dont tata kollam should be started directly. No delay, and good amount PM/SM time.
Let Tatanagar division introduce Biweekly from Tata to Benguluru via Raipur Ballashah and SC. Vskp has enough of demand for tatanagar for dedicated train. The present Tata Yesvantpur weekly should also be diverted via Raipur SC.
Totally agreed. And should be categorized as SF instead of Mail/Exp. Because on this route most of the trains run as express and gets heavily delayed. Example:08840 running by 8+ hrs late.
Page# 671592 Blog Entries next>>