Search Forum
Blog Entry# 1048992
Posted: Apr 07 2014 (15:31)
10 Responses
Last Response: Apr 15 2014 (22:36)
10 Responses
Last Response: Apr 15 2014 (22:36)
Pandharpur station now advanced. All LED aspect signals are placed. Now no shunting without signal permission. Automatic points changing. Two new siding work under process. Station master cabin changed.
5 Posts
thanks..i was asking becos i had seen a tender for coach display system at PVR..that was long ago..dont know what happened after that..I know the number of express trains running on KWV-MRJ section!
btw do you know whether MST buses still runs from KWV railway station to PVR connecting Hutatma Express which arrives at KWV around 09:00 p.m.?