Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Mandovi Express - the best 5-Star Restaurant in the world

Search Forum
<<prev entry    next entry>>
Blog Entry# 1070838
Posted: Apr 25 2014 (11:59)

12 Responses
Last Response: Apr 26 2014 (20:02)
Info Update
2116 views
1

Apr 25 2014 (11:59)   PTA/Patiala (4 PFs)
 
thetrainexplorer~
thetrainexplorer~   3156 blog posts
Entry# 1070838            Tags  
Station cleanliness drive is on. Paint work, uprooting weeds from the entire premises, track cleaning, track weed removal etc.
Translate to English
Translate to Hindi

28 Posts

1087 views
1

Apr 26 2014 (15:18)
thetrainexplorer~
thetrainexplorer~   3156 blog posts
Re# 1070838-31            Tags   Past Edits
Patiala  
Though the Chairman, Railway Board, himself was at DMW, rest of the officials were at Station and checking and inspecting. There were around 10 officials including DRM, UMB division were present at the station. Chairman'e AC coach was parked at PF 1 A and a red carpet was laid from coach to the entrance to the station. I hooked up one of the officials and got details from him, regarding their visit and whole scenario. I was told that the Chairman was here to give green signal to start of new duties and functions of DMW. He also said that the section shall be made token less and that is why the levers and other old equipments are being removed from LCs and other. He also said that one of the other decisions to electrify this section that in Punjab there are maximum rail roko protests etc, so IR is taking...
more...
such routes into consideration , which can serve as detour. This is so, because all the trains coming till RPJ are hauled by electric locos and there'll be no time to change the loco to move on this current diesel route via PTA-DUI-LDH, and moreover in a short span so many diesel locos are difficult to arrange. And the PTA-DUI-LDH section is small and they can't wast time to change to loco again and again. so keeping in that view this whole section shall be electrified along with being a feeder route for DFC. He said Dhablaan (DBN) shall be converted into Junction and preparations are ON for Dhablaan-Jakhal-Hissar route, as from Patiala its difficult to lay a new line towards jakhal due to high density population. Dhablaan is just 12 kms from PTA and is 5 kms from PTE (Patiala Cantt) , Dhablaan is also be made a main loading point for military, and military has laid their own track and IR just has to join the two sections and the Patiala-Jakhal link shall be UP.
He said if there is a traffic block between RPJ and Sirhind, all trains shall be re-routed on RBR till Dhuri and then towards LDH etc. He also said that Jakhal-DUI-LDH route is given more importance as it shall from now onwards handle maximum traffic going from Delhi towards LDH etc. Means , they'll divert or the new train on this route shall be plying now on JKL-DUI-LDH. RPJ-DUI-LDH via PTA shall be used as detour in case of traffic block due to rail protest or accident.
He said it is mandatory to pass 7 trains of coal from RBR daily, but now a days the freight traffic is going to BTI via main lines from some branch line near LDH. cuz of maintenance work going on near Dhablaan and a traffic is blocked for 3-4 hrs daily and they can't hold coal trains for that long. And that is why those red banner flags come up on this section. PTA main PF 1's length is going to be increased and the work for that is going to start in few days. The height of the FOB won't be increased, the Panto shall lower itself accordingly,a s the FOB is not that low. He also said that for shatabdi, the PTA track has to be cleared to handle a speed or MPS 120 as compared to current speed of 90-100. He also said that technically the PTA route can handle the speed of 120 kmph, but the officials have to give clearance on records. (Babu giri, or general official formalities in Indian govt. depts or RED TAPISM) or what you can call it is holding up the issue. Stange is that the PTA track is fit for 25tn axle load, but can't handle speed increase from 90-100 to 120. Wow..! . Any how he too agreed that there are many formalities in IR due to which lot of projects or issues gets delayed. He said they where very much sure that Rajpura-Patiala-Dhuri-Lehra Mohabat route shall be given importance first, but due to political intervention , the Jakhal-DUI-LDh section is done at first. Strange again..!! All the track ballast unloaded around the station area, shall be used for existing tracks cuz as per survey the ballast packing is less at present, due to which the vibration gets more.

Translate to English
Translate to Hindi

1092 views
1

Apr 26 2014 (15:30)
Rang De Basanti^   58810 blog posts
Re# 1070838-32              
thanx for detailed update and Tremendous efforts..!
Translate to English
Translate to Hindi

888 views
0

Apr 26 2014 (20:02)
thetrainexplorer~
thetrainexplorer~   3156 blog posts
Re# 1070838-33               Past Edits
IR never considered or never gave importance to this route and PTA is the oldest station in the region, over 70 years old. Inspite of the station Manager's request to the DRM etc, they are not ready to increase the rake of one of the loaded trains here, the Ambala-BTI passenger, and over 100 passengers are left stranded every day due to non availability of seats etc. I simply fail to understand the functioning of one of the worlds largest organisations , as they are ready to loose those 100 passengers to roadways, than to provide 2 extra bogies.. And i was told by one of the staff, that sir, You as a patron write a petition to DRM etc, for such request and try to collect 40-50 person's recommendation for to make it feasible, as they won't listen to us as we are staff.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy