Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

For RailFans, the Journey itself is the Destination. - Sreerup Patranabis

Search Forum
<<prev entry    next entry>>
Blog Entry# 1168424
Posted: Jul 22 2014 (14:41)

12 Responses
Last Response: Jul 24 2014 (16:38)
Rail Fanning
10276 views
18

★★★
Jul 22 2014 (14:41)   56616/Nilambur Road - Shoranur Fast Passenger (UnReserved) | NIL/Nilambur Road (2 PFs)
 
Jayasankar Madhavadas
Jayasankar Madhavadas   458 blog posts
Entry# 1168424            Tags  
NIL - SRR passenger with the ERS workhorse all set to depart the picturesque Nilambur ....
Translate to English
Translate to Hindi

8 Public Posts - Tue Jul 22, 2014

4771 views
1

Jul 22 2014 (21:06)
PKV~
PKV~   25536 blog posts
Re# 1168424-9              
Very true Jaya. And here are the major achievements of the Council.
ACHIEVEMENTS:
1)Timings were revised and connection to Parasuram Express obtained.
2)Extension of NIL-SRR Passenger to Palakkad obtained.(We thought an extension outside would save closure of the line)
3)ORGANISED
...
more...
A 'RAIL ROKO' AT SHORANUR AGAINST NEGLECT OF NILAMBUR LINE BY BLOCKING PARASURAM EXPRESS FOR 2 HOURS in 1997.
Immediate provocation was Railway's reluctance to run DEMU sanctioned for Nilambur.
4)Railways ran DEMU in the route the next week.
5)A sit in protest on rail track (2nd Line) at Vaniambalam,to protest against degrading the station and attempts to dismantle the 2nd line.
6)The photos of poor condition of track between Melattur and Nilambur were taken and sent to PM,Railway Board,Ministers and MPs.The speed was 50 kmph between MLTR and SRR and 40 KMPH between MLTR and NIL.The speed was a paltry 20 Kmph between MLTR and Tuvvur.(These tracks had wooden sleepers and had light rail,which would not allow higher speed)
FINALLY IN 2000-01 RAIL BUDGET,SANCTION FOR COMPLETE RAIL RENEWAL WAS ORDERED BY Kum.MAMATHA BANERJEE.
7)A cut trip of DEMU was run between SRR and AAM due to our efforts.
8)The trip extended to NIL as FP to connect Venad Express (3rd train)
9)Track renewal between Melattur and Nilambur started.
10)PRS centre sanctioned at AAM,on our pettition to Sri.O.Rajagopalji,Hon MOSR who visited AAM.
11)Survey ordered for NIL-Bathery-Nanjangud line.Reception given to Sri.O.Rajagopal at Kalpetta and Nilambur.
12)Attempts to get a morning train started in 2006.At last a train halting at Nilambur started running in January 2007.(Find reception photos in the album)This was one of our major acheivements.(4th Train)
13)2nd PF at AAM.
14)The plea to run an extra noon train using the idling rake of ERS-SRR Passenger was raised in Divisional Railway Users Consultative Committee meetings.This was agreed and in August 2007 a new trip serving as direct service from Nilambur to Ernakulam was started.(5th Train)
15)Angadipuram-Malappuram-Kozhikode line survey ordered.
16)Our plea to improve amenities at small halt stations agreed and works started at Melattur,Thodiyapulam and Pattikad.
All stations in the route were sanctioned PF lights,shelters,toilets and benches.
17)Proposal for new crossing stations at MLTR and KLKLR agreed and proposed by Palakkad division.
18)PF stalls at AAM and NIL.Earlier no food item was available in the route.
19)A walkway connecting PF 1 and 2 at AAM.
20)Combined UTS cum PRS at Nilambur in May 2009.
21)OFC cable laying and Signalling works started,due to our pleas.Late running of trains due to signal failures and broken overhead telephone lines were a regular feature.
22)Mr.E.Ahmed Ji assumes charge as MOSR.FCI godown at AAM reopened.
23)New evening train sanctioned.Inaugural run in August 2009.
24)Combined UTS cum PRS at Vaniambalam.
25)Complete Concrete sleeper laying and new track laid between Melattur and Shoranur.
27)Platform works at Vadanamkurishi,Vallapuzha,Cherukara,Tuvvur Vaniambalam and Angadipuram started.
28)Nilambur declared 'Adarsh' station.New modern Waiting hall inaugurated during GM's visit on Jan 5th 2011.Discussions held with GM and officers regarding NIL-TVC Express train.
29)New station buildings with second entry at NIL and AAM sanctioned. Foundation stones for development works laid by Mr.E.Ahmed on 12-01-11.
Hon Minister travels by train to Nilambur.
30)Efforts on for direct train to Thiruvananthapuram.(Details on Rajya Rani page)
31)Rajya Rani Exp announced in Rail budget 2011.
32)New goods shed at NIL sanctioned in budget.
33)Complete track renewal and concrete sleeper laying between Melattur and Nilambur sanctioned in budget.
34)NIL-SBY-Nanjangud line gets sanction in principle by Railway Board.
35)Resurvey for AAM-CLT and Nanjangud lines.
36)Section speed increased to 75 KMPH on 14-11-11.
37)Rajya Rani Exp inaugurated on 16-11-11.
38)Preliminary works to realign 3rd line (FCI line) at AAM so as to widen 2nd PF at AAM and provide PF shelter,Foot overbridge started.FCI line to be lengthened to hold 20 wagons.
39)Rail level temporary 2nd PF provided at VNB.
40)Tender called for new station building at Angadipuram.
IT HAS BEEN SUCCESSFUL IN LINKING NILAMBUR TO THE STATE CAPITAL,THIRUVANANTHAPURAM AFTER THE INTRODUCTION OF NILAMBUR-THIRUVANANTHAPURAM RAJYA RANI EXPRESS ON 16th NOV 2011.

Translate to English
Translate to Hindi

2 Public Posts - Tue Jul 22, 2014

1 Public Posts - Thu Jul 24, 2014
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy