Search Forum
Blog Entry# 1201830
Posted: Aug 30 2014 (13:57)
10 Responses
Last Response: Sep 28 2014 (19:26)
10 Responses
Last Response: Sep 28 2014 (19:26)
Good news...one more railway line to cnnct rai breilly with unchahar...Work has been quickened to double lko bsb line...bsb phaphamau ald line electrified needs crs inspectn..long route trains comng frm bihar side cn go via lko instead of bsb...
5 Posts
Via gaya goes bsb jnh via Patna goes ald mzp mgs pata hai sirji.......
Considering the load on HWH BJU MGS ALD CNB NDLS, an alternate route can be created by doubling & electrification on HWH BJU CPR BUI ARJ BSB ZBD SLN LKO MB NDLS
Agree..... It will take off huge load from the busiest section.
Along with this ARJ MAU BTT section should also be doubled and electrified
Along with this ARJ MAU BTT section should also be doubled and electrified
Any idea about the Track Doubling / Electrification between Varanasi and Lucknow via Rae Bareli - Amethi ? :-)