Search Forum
PNR Entry# 1221651
Posted: Sep 23 2014 (03:40)
2 Responses
Last Response: Sep 25 2014 (13:14)
2 Responses
Last Response: Sep 25 2014 (13:14)
Journey: Fri Sep 26, 2014
Dep: DINR/Divine Nagar @ 14:35 PF#: 2
Arr: KRMI/Karmali @ 05:16 +1 night
Distance: 716 km / 1498 km
Class: AC 2-tier - 2A | Charting @10:15
16346/Netravati Express (PT)Dep: DINR/Divine Nagar @ 14:35 PF#: 2
Arr: KRMI/Karmali @ 05:16 +1 night
Distance: 716 km / 1498 km
Class: AC 2-tier - 2A | Charting @10:15
PNR: 410-xxxxxxx | Similar PNRs
Entry# 1221651
NO PENDING REQUEST
Posted: Sep 23 2014 (03:40:03) View Posted Status
Latest Status: Sep 25 2014 (13:20:30)
Passenger 2: Can/Mod (Booking Status: W/L 12,GNWL)Chart NOT Prepared
I know it might get confirm after charting done but before that it is not likely. while going our PQWL was 3,4 but we bought on TATKAL and cancelled W/L chargess 70 + 22 = 92 +15 Bank charges. We might do the same on 25th 10am
last night 7pm it was down to WL2 WL3 it did not change after that waited till 10.15am and then took 2 Tatkal and cancelled the same. but about one hour later 11.15 the booking WL which was 9 was down to 4 which mean we would have been into RAC by now but at this time all 4 2AC gone within 1 hr and all 259 SL gone in less than 30 mins but 3AC were available even now at 1.12pm 7 out of 64.