Full Site Search  
Thu Apr 27, 2017 22:25:45 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

<<prev entry    next entry>>
Blog Entry# 1301408  
Posted: Dec 09 2014 (08:23)

4 Responses
Last Response: Dec 09 2014 (12:19)
  
Rail News
0 Followers
1123 views
Other NewsCR/Central  -  
Dec 09 2014 (02:46)   Central Railway identifies trouble spots on tracks
 

Jayashree ❖ Amita*^   36145 news posts
Entry# 1301408   News Entry# 204087         Tags   Past Edits
The Central Railway has identified 17 spots between Thane and Mumbra section where motormen have to constantly juggle between Direct Current (DC) and Alternate Current (AC) since the conversion early this year. This is slowing down trains in its slow-corridor, causing delays of at least 10 to 15 minutes everyday.
The CR had converted Thane to Kalyan to AC 25kv from 15 kv. But the work between Thane to Kurla and eventually CST did not take off due to lack of funds. This left sections between Thane and Mumbra still on DC, due to which motormen find it difficult to run trains.
“When
...
more...
you shift from one electrical system you have to lower the pantograph run on neutral for a few seconds and raise it back up when you enter the other electrical system. While we do this we have to ensure that we have now shifted to the corresponding system in the motorcoach as well. So it is very stressful. This happens on 17 spots and there is one section that has very little distance between the switches, one mistake and there might be electrical issue, even a fire,” said a motorman.

  
1331 views
Dec 09 2014 (08:23)
Kuchh to log kahenge   202 blog posts   12 correct pred (80% accurate)
Re# 1301408-1            Tags   Past Edits
Is Central Railway waiting for some accident to occur???????? No value of human life who put them on risk.

  
1250 views
Dec 09 2014 (08:32)
Addicted To IRI®♔®~   15481 blog posts   627 correct pred (62% accurate)
Re# 1301408-2            Tags   Past Edits
Isme Kya Hai Accident Jaisa

  
1094 views
Dec 09 2014 (10:49)
Vote for Durg HumSafar Vs BSP Rajdhani^~   80669 blog posts   5098 correct pred (78% accurate)
Re# 1301408-3            Tags   Past Edits
Yeah, if there is fire hazard then it can be dangerous

  
1142 views
Dec 09 2014 (12:19)
ranjitg370   2354 blog posts   1141 correct pred (74% accurate)
Re# 1301408-4            Tags   Past Edits
central railway now running dual power DC - AC emu rakes between mumbra - thane - cstm bcz of DC strectch. Now kalyan to thane fast line is converted to AC line from DC and from mumbra - thane - cstm slow line is still DC. So all north bound kalyan - kasara - karjat emu rakes is running with dual DC - AC power. It is stressful for all emu trains motermen to raise the pantograph of emu trains between Thane - Mumbra slow line for shifting from one electricity system you have to lower the pantograph neutral for few seconds and raise up the pantograph back it up for enter other electrical system. And work is going for DC – AC conversion between mumbra – thane – cstm strectch after complete than this problem will be solve easily.
Scroll to Top
Scroll to Bottom


Go to Desktop site