Jan 15 2015 (11:54) 12890/SMVT Bengaluru - Tatanagar SF Express
K Ramakrishna Kini~
K Ramakrishna Kini~ 1580 blog postsThis train passes through Raygada Sambalpur Koraput route.
Are these routes electrified?
Are these routes electrified?
5 Posts
Thanks :) I got confused because diesel link for this train not shown in the forum
This train runs with a diesel loco from tata-vskp section and reverse, mostly with some vskp alco locos.
This runs from YPR-TATA via VSKP, YPR VSKP is double and electrified. VSKP-TIG is doubled and electrification under progress.
TIG to SBP its single non electrified. SBP-JSG is fully double and Non-electrified, JSG-TATA is fully double and electrified
TIG to SBP its single non electrified. SBP-JSG is fully double and Non-electrified, JSG-TATA is fully double and electrified
OHE's are coming up after Rayagada n SBP.
TIG - SBP is single, Raipur - TIG is single, TIG - RGDA is double n diesel, RGDA - VBL - VZM is under electrification with slow progress.
Koraput - Damanjodi n few more miles in outer its electrified.
TIG - SBP is single, Raipur - TIG is single, TIG - RGDA is double n diesel, RGDA - VBL - VZM is under electrification with slow progress.
Koraput - Damanjodi n few more miles in outer its electrified.
If TIG-RGDA is double, but still i think the timings of most of the trains remain what it was for so many years. Earlier the times were formulated keeping in mind the single line section.But evn after doubling, there seems to be no speeding up of train timings.