Jan 27 2015 (18:42) CRJ/Chittaranjan (3 PFs) | KYN/WAG-9/31364 guest 6387 blog posts
Entry# 1353010 Tags Past Edits
Dec 06 2015 (1:21PM)
1KALYAN AJNI WAG WAP 9 7 31364(CLW 30315(CLW NO of this loco: TG-343 TPP-115 Despatch Date from CLW: 26 30
11
12)
Source:
Photo taken by: Pratik12259
2 AJNI WAP 7 30315(CLW NO of this loco: TPP-115 Despatch Date from CLW: 30
Thanks
Oct 05 2015 (1:50PM)
(Project Updates from Jan 2015 to Sept 2015 and Targets of Oct 2015 has been shared so far in the Replies of this BLOG )
Thanks
Oct 05 2015 (1:49PM)
(So (Project Far Project Jan 2015 to Sept 2015 has been shared so far in the Replies of this BLOG )
Thanks
Oct 05 2015 (1:48PM)
(So Far Project Updates from Jan 2015 to Sept 2015 has been shared so far in the Replies of this BLOG )
Thanks
Oct 05 2015 (1:39PM)
THIS BLOG IS BEING UPDATED IN EVERY MONTH AND WILL ALSO BE UPDATED IN FUTURE IN THIS MANNER so long the "Ongoing Project of 3 Phase Ac Locomotives" carried On by Center for Design and Development(C-D&D) of Chittaranjan Locomotive works in Future
Thanks
Jun 18 2015 (12:15AM)
Thanks
May 05 2015 (10:50PM)
THIS BLOG IS BEING UPDATED IN EVERY MONTH AND WILL ALSO BE UPDATED IN FUTURE IN THIS MANNER
Thanks
May 05 2015 (10:37PM)
THIS BLOG IS BEING UPDATED IN EVERY MONTH AND WILL ALSO BE UPDATED IN FUTURE
Thanks
Jan 28 2015 (4:33PM)
xls xls(Extracted from the Official Website of CLW)
xls xls(Extracted from the Official Website of CLW)
xls xls(Extracted from the Official Website of CLW)
*** Please download the "Excel Spreadsheets" for seeing the issues of IGBT Locos
Please Thanks download the "Excel Spreadsheets" for seeing the issues of IGBT Locos
Thanks
Jan 28 2015 (4:28PM)
Thanks Please download the "Excel Spreadsheets" for seeing the issues of IGBT Locos
Thanks
Jan 28 2015 (4:26PM)
As IGBT Traction Converters used in 3 Phasers are built by three firms namely ABB, BHEL and BTIL and assembled by CLW in the 3 Phase Locomotives so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is being installed in the Loco
You can see the "Comment of RDSO" against "Each Issue" addressed to"Each "ABB"in Firm" the last column of first Excel Spreadsheet and in other two excel spreadsheets you can see the "status of the issue" and "Firm's Comment about the issue" in the last column of the Excel Spreadsheet
Thanks
Jan 28 2015 (4:13PM)
IGBT Loco Issues:
As IGBT Traction Converters used in 3 Phasers are built by three firms namely ABB, BHEL and BTIL so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is being installed in the Loco
Please see the three attached "Excel Spreadsheets" to know about the Issues regarding IGBT Locomotives(3 Phaser specially WAP7,WAG 9, WAG 9H & WAG 9i)
You can see the "Comment of RDSO" against "Each Issue" addressed to "Each Firm"
Attached Excel Worksheets:
1 IGBT LOCO ISSUES WITH ABB
xls
2 IGBT LOCO ISSUES WITH BHEL
xls
3 IGBT LOCO ISSUES WITH BTIL
xls
IGBT Loco Issues:
As IGBT Traction Converters used in 3 Phasers are built by three firms namely ABB, BHEL and BTIL so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is being installed in the Loco
Please see the three attached "Excel Spreadsheets" to know about the Issues regarding IGBT Locomotives(3 Phaser specially WAP7,WAG 9, WAG 9H & WAG 9i)
You can see the "Comment of RDSO" against "Each Issue" addressed to "Each Firm"
Attached Excel Worksheets:
3 IGBT LOCO ISSUES WITH ABB
xls
4 IGBT LOCO ISSUES WITH BHEL
xls
5 IGBT LOCO ISSUES WITH BTIL
xls
Thanks
Jan 28 2015 (4:08PM)
If you want to know the "Issues with IGBT Locos" Loco then Issues: please refer the following link:
After clicking As on LOCOS" Traction Converters used in 3 Phasers are built by three firms namely ABB, BHEL and BTIL so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is written being installed in Blue the Color Loco
PleaseIn see the same three page attached you "Excel will Spreadsheets" also to find know a about "Navigation left Issues side regarding of IGBT the Locomotives(3 page Phaser specially WAP7,WAG 9, WAG 9H & WAG 9i)
In You that can navigation see panel heading "Comment "ISSUES of WITH RDSO" IGBT against LOCOS" "Each you Issue" will addressed find to three "Each Firm Firm" names viz:
ABB
BHEL
BTIL
Now click on each Firm Name
For example click on "ABB" you will find a page where the following text is written in the "Top" of that page
Link:
Reliability issues in IGBT based Traction Converters of M/s ABB
(Click here to download complete excel file)
click on "BHEL" you will find a page where the following text is written in the "Top" of that page
Link:
Reliability issues in IGBT based Traction Converters of BHEL
(Click here to download complete excel file)
click on "BTIL" you will find a page where the following text is written in the "Top" of that page
Link:
Reliability issues in IGBT based Traction Converters of BTIL
(Click here to download complete excel file)
As IGBT Traction Converters used in 3 Phasers are built by ABB, BHEL and BTIL so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is being installed in the Loco
You Attached can Files Worksheets: of the 3 Firms from which you can know the detailed status of IGBT Issues with
1 IGBT LOCO ISSUES WITH ABB
BHEL xls
BTIL 2 IGBT LOCO ISSUES WITH BHEL
xls
3 IGBT LOCO ISSUES WITH BTIL
xls
Thanks
Jan 28 2015 (4:01PM)
Thanks
Jan 27 2015 (7:55PM)
BHEL and dispatched to ELS/BRC
1st WAG 9H locomotive 31563 with Prototype unit of IGBT based Auxiliary converter of M/s HIRECT and dispatched to ELS/GMO
Thanks
Jan 27 2015 (7:43PM)
Achievements in the month ofDecember’14 December 2014
Targets for the month ofJanuary’15 January 2015
Thanks
Jan 27 2015 (7:43PM)
Attached Image:
This is "A Compact Information" about 3 Phase Locos(Specially: WAP 7, WAG 9, WAG 9H & WAG 9I) presented here from the Official Website of CLW
Views and Opinions are welcome
Thanks
Attached Image:
This is "A Compact Information" about 3 Phase Locos(Specially: WAP 7, WAG 9, WAG 9H & WAG 9I) presented here from the Official Website of CLW
Thanks
Jan 27 2015 (7:41PM)
1AJNI KALYAN WAP WAG 7 9 30315(CLW 31364(CLW NO of this loco: TPP-115 TG-343 Despatch Date from CLW: 30 26
11
12)
Source:
Photo taken by: Pratik12259
2 AJNI WAP 7 30315(CLW NO of this loco: TPP-115 Despatch Date from CLW: 30
Source:
Jan 27 2015 (7:33PM)
------- Some important facts taken from the Official Website of Chittaranjan Locomotive Works regarding the "Ongoing Project of 3 Phase Ac Locomotives" carried On by Center for Design and Development(C-D&D) of Chittaranjan Locomotiveworks: works --------
Progress ************Progress of Ongoing Projects regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW CLW**********
Source:
Jan 27 2015 (7:32PM)
1 AJNI WAP 730315 30315(CLW NO of this loco: TPP-115 Despatch Date from CLW: 30
Source: 06
12)
Source:
Jan 27 2015 (7:29PM)
Attached Image:
1 AJNI WAP 7 30315
Source:
1
Thanks
Oct 05 2015 (1:50PM)
(Project Updates from Jan 2015 to Sept 2015 and Targets of Oct 2015 has been shared so far in the Replies of this BLOG )
Thanks
Oct 05 2015 (1:49PM)
Thanks
Oct 05 2015 (1:48PM)
(So Far Project Updates from Jan 2015 to Sept 2015 has been shared so far in the Replies of this BLOG )
Thanks
Oct 05 2015 (1:39PM)
THIS BLOG IS BEING UPDATED IN EVERY MONTH AND WILL ALSO BE UPDATED IN FUTURE IN THIS MANNER so long the "Ongoing Project of 3 Phase Ac Locomotives" carried On by Center for Design and Development(C-D&D) of Chittaranjan Locomotive works in Future
Thanks
Jun 18 2015 (12:15AM)
Thanks
May 05 2015 (10:50PM)
THIS BLOG IS BEING UPDATED IN EVERY MONTH AND WILL ALSO BE UPDATED IN FUTURE IN THIS MANNER
Thanks
May 05 2015 (10:37PM)
THIS BLOG IS BEING UPDATED IN EVERY MONTH AND WILL ALSO BE UPDATED IN FUTURE
Thanks
Jan 28 2015 (4:33PM)
*** Please download the "Excel Spreadsheets" for seeing the issues of IGBT Locos
Jan 28 2015 (4:28PM)
Thanks
Jan 28 2015 (4:26PM)
As IGBT Traction Converters used in 3 Phasers are built by three firms namely ABB, BHEL and BTIL and assembled by CLW in the 3 Phase Locomotives so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is being installed in the Loco
You can see the "Comment of RDSO" against "Each Issue" addressed to
Thanks
Jan 28 2015 (4:13PM)
IGBT Loco Issues:
As IGBT Traction Converters used in 3 Phasers are built by three firms namely ABB, BHEL and BTIL so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is being installed in the Loco
Please see the three attached "Excel Spreadsheets" to know about the Issues regarding IGBT Locomotives(3 Phaser specially WAP7,WAG 9, WAG 9H & WAG 9i)
You can see the "Comment of RDSO" against "Each Issue" addressed to "Each Firm"
Attached Excel Worksheets:
3 IGBT LOCO ISSUES WITH ABB
xls
4 IGBT LOCO ISSUES WITH BHEL
xls
5 IGBT LOCO ISSUES WITH BTIL
xls
Thanks
Jan 28 2015 (4:08PM)
Please
1 IGBT LOCO ISSUES WITH ABB
xls
3 IGBT LOCO ISSUES WITH BTIL
xls
Thanks
Jan 28 2015 (4:01PM)
Thanks
Jan 27 2015 (7:55PM)
BHEL and dispatched to ELS/BRC
1st WAG 9H locomotive 31563 with Prototype unit of IGBT based Auxiliary converter of M/s HIRECT and dispatched to ELS/GMO
Thanks
Jan 27 2015 (7:43PM)
Achievements in the month of
Targets for the month of
Thanks
Jan 27 2015 (7:43PM)
Attached Image:
This is "A Compact Information" about 3 Phase Locos(Specially: WAP 7, WAG 9, WAG 9H & WAG 9I) presented here from the Official Website of CLW
Thanks
Jan 27 2015 (7:41PM)
1
11
12)
Source:
Photo taken by: Pratik12259
2 AJNI WAP 7 30315(CLW NO of this loco: TPP-115 Despatch Date from CLW: 30
Source:
Jan 27 2015 (7:33PM)
------- Some important facts taken from the Official Website of Chittaranjan Locomotive Works regarding the "Ongoing Project of 3 Phase Ac Locomotives" carried On by Center for Design and Development(C-D&D) of Chittaranjan Locomotive
Source:
Jan 27 2015 (7:32PM)
1 AJNI WAP 7
12)
Source:
Jan 27 2015 (7:29PM)
Attached Image:
1 AJNI WAP 7 30315
Source:
#railwayengineering
THIS BLOG IS BEING UPDATED IN EVERY MONTH AND WILL ALSO BE UPDATED IN FUTURE IN THIS MANNER so long the "Ongoing Project of 3 Phase Ac Locomotives" carried On by Center for Design and Development(C-D&D) of Chittaranjan Locomotive works in Future. (Project Updates from Jan 2015 to Sept 2015 and Targets of Oct 2015 has been shared so far in the Replies of this BLOG )
------- Some important facts taken from the Official Website of Chittaranjan Locomotive Works regarding the "Ongoing Project of 3 Phase Ac Locomotives" carried On...
more...
THIS BLOG IS BEING UPDATED IN EVERY MONTH AND WILL ALSO BE UPDATED IN FUTURE IN THIS MANNER so long the "Ongoing Project of 3 Phase Ac Locomotives" carried On by Center for Design and Development(C-D&D) of Chittaranjan Locomotive works in Future. (Project Updates from Jan 2015 to Sept 2015 and Targets of Oct 2015 has been shared so far in the Replies of this BLOG )
------- Some important facts taken from the Official Website of Chittaranjan Locomotive Works regarding the "Ongoing Project of 3 Phase Ac Locomotives" carried On...
more...
by Center for Design and Development(C-D&D) of Chittaranjan Locomotive works --------
************Progress of Ongoing Projects regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW**********
Achievements in the month of December 2014
1. 1st WAP-5 locomotive 30082 fitted with IGBT based
Traction converter, Auxiliary converter and TCN VCU of M/s. BHEL and dispatched to ELS/BRC.
2. Commissioning of 2nd set of IGBT based Propulsion system of M/s Medha completed on Loco No. 31549.
3. 1st WAG 9H locomotive 31563 with Prototype unit of IGBT based Auxiliary converter of M/s HIRECT and dispatched to ELS/GMO.
4. Field trial of M/s. Medha make Hotel Load Converter fitted in loco no. 30375 (WAP-7) completed successfully on NDLS-Kalka Shatabdi alongwith RDSO representatives.
5. IGBT based Traction converters & Auxiliary Converter provided on 13 locomotives & 14 locomotives respectively during Dec.’14 at CLW.
Targets for the month of January 2015
1. Commissioning of Hotel load converter supplied by M/s Siemens on Loco No. 30406.
2. Commissioning of Hotel load converter supplied by M/s BHEL on Loco No. 30426.
3. Commissioning of 3rd & 4th set of IGBT based Propulsion systems supplied by M/s Medha on Loco No. 31557 and 31559.
4. Finalisation of new software version for WAG9/WAP7 locomotives incorporating driver display, VCU redundancy and other reliability improvement features.
5. STRs of Auxiliary Converter, VCU & Transformer for 3-Ph locomotives to be finalized after receipt of comments from RDSO.
6. Finalisation of specification for IGBT based Traction, Auxiliary converter and VCU.
For more details of the progress of this project please visit: click here
A total number of 191(One Hunderd Ninety One)IGBT Loco turned out from CLW during the period (01.04.2012 to 31.12.2014). For all the details of these 191 3 Phase AC Electric Locomotives( Like: Serial Number, Type of the Loco, CLW No of Each Loco, Loco No of each loco,Rail Zone where allotted, Sheds where allotted, Despatch date of each loco from CLW etc) please visit the following link:
click here
Only 4 IGBT Locos are despatched from CLW prior to 01.04.2012. For details of these 4 Locos(Like: Serial Number, Type of the Loco, CLW No of Each Loco, Loco No of each loco,Rail Zone where allotted, Sheds where allotted, Despatch date of each loco from CLW etc) please visit the following link:
click here
Attached Image:
1 AJNI WAP 7 30315(CLW NO of this loco: TPP-115 Despatch Date from CLW: 30.06.12)
Source: click here
IGBT Loco Issues:
As IGBT Traction Converters used in 3 Phasers are built by three firms namely ABB, BHEL and BTIL and assembled by CLW in the 3 Phase Locomotives so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is being installed in the Loco.Please see the three attached "Excel Spreadsheets" to know about the Issues regarding IGBT Locomotives(3 Phaser specially WAP7,WAG 9, WAG 9H & WAG 9i). You can see the "Comment of RDSO" against "Each Issue" addressed to "ABB"in the last column of first Excel Spreadsheet and in other two excel spreadsheets you can see the "status of the issue" and "Firm's Comment about the issue" in the last column of the Excel Spreadsheet .
Attached Excel Worksheets:
3 IGBT LOCO ISSUES WITH ABB.xls(Extracted from the Official Website of CLW)
4 IGBT LOCO ISSUES WITH BHEL.xls(Extracted from the Official Website of CLW)
5 IGBT LOCO ISSUES WITH BTIL.xls(Extracted from the Official Website of CLW)
*** Please download the "Excel Spreadsheets" for seeing the issues of IGBT Locos.
This is "A Compact Information" about 3 Phase Locos(Specially: WAP 7, WAG 9, WAG 9H & WAG 9I) presented here from the Official Website of CLW.
Thanks
************Progress of Ongoing Projects regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW**********
Achievements in the month of December 2014
1. 1st WAP-5 locomotive 30082 fitted with IGBT based
Traction converter, Auxiliary converter and TCN VCU of M/s. BHEL and dispatched to ELS/BRC.
2. Commissioning of 2nd set of IGBT based Propulsion system of M/s Medha completed on Loco No. 31549.
3. 1st WAG 9H locomotive 31563 with Prototype unit of IGBT based Auxiliary converter of M/s HIRECT and dispatched to ELS/GMO.
4. Field trial of M/s. Medha make Hotel Load Converter fitted in loco no. 30375 (WAP-7) completed successfully on NDLS-Kalka Shatabdi alongwith RDSO representatives.
5. IGBT based Traction converters & Auxiliary Converter provided on 13 locomotives & 14 locomotives respectively during Dec.’14 at CLW.
Targets for the month of January 2015
1. Commissioning of Hotel load converter supplied by M/s Siemens on Loco No. 30406.
2. Commissioning of Hotel load converter supplied by M/s BHEL on Loco No. 30426.
3. Commissioning of 3rd & 4th set of IGBT based Propulsion systems supplied by M/s Medha on Loco No. 31557 and 31559.
4. Finalisation of new software version for WAG9/WAP7 locomotives incorporating driver display, VCU redundancy and other reliability improvement features.
5. STRs of Auxiliary Converter, VCU & Transformer for 3-Ph locomotives to be finalized after receipt of comments from RDSO.
6. Finalisation of specification for IGBT based Traction, Auxiliary converter and VCU.
For more details of the progress of this project please visit: click here
A total number of 191(One Hunderd Ninety One)IGBT Loco turned out from CLW during the period (01.04.2012 to 31.12.2014). For all the details of these 191 3 Phase AC Electric Locomotives( Like: Serial Number, Type of the Loco, CLW No of Each Loco, Loco No of each loco,Rail Zone where allotted, Sheds where allotted, Despatch date of each loco from CLW etc) please visit the following link:
click here
Only 4 IGBT Locos are despatched from CLW prior to 01.04.2012. For details of these 4 Locos(Like: Serial Number, Type of the Loco, CLW No of Each Loco, Loco No of each loco,Rail Zone where allotted, Sheds where allotted, Despatch date of each loco from CLW etc) please visit the following link:
click here
Attached Image:
1 AJNI WAP 7 30315(CLW NO of this loco: TPP-115 Despatch Date from CLW: 30.06.12)
Source: click here
IGBT Loco Issues:
As IGBT Traction Converters used in 3 Phasers are built by three firms namely ABB, BHEL and BTIL and assembled by CLW in the 3 Phase Locomotives so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is being installed in the Loco.Please see the three attached "Excel Spreadsheets" to know about the Issues regarding IGBT Locomotives(3 Phaser specially WAP7,WAG 9, WAG 9H & WAG 9i). You can see the "Comment of RDSO" against "Each Issue" addressed to "ABB"in the last column of first Excel Spreadsheet and in other two excel spreadsheets you can see the "status of the issue" and "Firm's Comment about the issue" in the last column of the Excel Spreadsheet .
Attached Excel Worksheets:
3 IGBT LOCO ISSUES WITH ABB.xls(Extracted from the Official Website of CLW)
4 IGBT LOCO ISSUES WITH BHEL.xls(Extracted from the Official Website of CLW)
5 IGBT LOCO ISSUES WITH BTIL.xls(Extracted from the Official Website of CLW)
*** Please download the "Excel Spreadsheets" for seeing the issues of IGBT Locos.
This is "A Compact Information" about 3 Phase Locos(Specially: WAP 7, WAG 9, WAG 9H & WAG 9I) presented here from the Official Website of CLW.
Thanks
please wait...Translate to English
please wait...Translate to Hindi
75 Posts
9695 views
2
Re# 1353010-77 Past Edits
Mar 04 2016 (10:10PM)
******** More& & More 3-Phase Locos are Fitted with Hotel Load Converters(HOG System) *******
Position of Ongoing Project regarding 3 Phase AC Electric Locomotives carried on byC-D&D C-D&D of CLW(Chittaranjan Locomotive Works)
In this reply I will describe the Achievements in the month of January2013 2016 and Targets set for the month of February 2016:
Achievements in the month ofJanuary’16 January’16
30446 fitted with dual hotel windings alongwith Hotel load converter of M/s Siemens dispatched to ELS/GZB inJan’16 Jan’16
31646, 31653, 31718, 30448, 30450& & 31672 in Jan’16 Jan’16
Targets for the month ofFebruary’16 February’16
30453, 30454& & 30455 alongwith 7775kVA double winding transformers
So, Loco Number 30446 is now have HOG Facility(In Jan 2016) and in this Month Loco Nos 30423,30454& & 30455 will be fitted with HOG Facility with 7775kVA double winding transformers
Feb 02 2016 (3:26PM)
******** More & More 3-Phase Locos are Fitted with Hotel Load Converters(HOG System) *******
******** More
Position of Ongoing Project regarding 3 Phase AC Electric Locomotives carried on by
In this reply I will describe the Achievements in the month of January
Achievements in the month of
30446 fitted with dual hotel windings alongwith Hotel load converter of M/s Siemens dispatched to ELS/GZB in
31646, 31653, 31718, 30448, 30450
Targets for the month of
30453, 30454
So, Loco Number 30446 is now have HOG Facility(In Jan 2016) and in this Month Loco Nos 30423,30454
Feb 02 2016 (3:26PM)
******** More & More 3-Phase Locos are Fitted with Hotel Load Converters(HOG System) *******
******** More & More 3-Phase Locos are Fitted with Hotel Load Converters(HOG System) *******
Position of Ongoing Project regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW(Chittaranjan Locomotive Works)
In the last reply I described the Achievements in the month of December 2015 and Targets for the month of January 2016 . In this reply I will describe the Achievements in the month of January 2016 and Targets set for the month of February 2016:
Achievements...
more...
Position of Ongoing Project regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW(Chittaranjan Locomotive Works)
In the last reply I described the Achievements in the month of December 2015 and Targets for the month of January 2016 . In this reply I will describe the Achievements in the month of January 2016 and Targets set for the month of February 2016:
Achievements...
more...
in the month of January’16
1. Expression of interest (EOI) for development of Alternate Gear Drive System for WAP-5 locomotives uploaded on CLW website.
2. 3rd set of Alternate Drive Gear Arrangement for 160 Kmph supplied, by M/s Henschel/Germany, commissioned on Loco no. 30090. Loco sent to ELS/BRCY.
3. Prototype inspection of DPWCS for AC tap changer locos, developed by M/s Medha, carried out by CLW/RDSO from 11.01.2016 to 19.01.2016.
4. 2nd loco No. 30446 fitted with dual hotel windings alongwith Hotel load converter of M/s Siemens dispatched to ELS/GZB in Jan’16.
5. IGBT propulsion system of M/s Medha commissioned on Loco Nos. 31646, 31653, 31718, 30448, 30450 & 31672 in Jan’16.
Targets for the month of February’16
1. Commissioning of Hotel load converters supplied by M/s Siemens on Loco No. 30453, 30454 & 30455 alongwith 7775kVA double winding transformers.
2. 4th set of Alternate Drive Gear Arrangement for 160 Kmph supplied by M/s Henschel/Germany to be commissioned on Loco no. 30100.
3. Capacity-cum-Capability assessment of M/s ARC/Bangalore and M/s Trolex/Bangalore for the development of TCN compliant vehicle control system to be carried out by CLW/RDSO.
4. STR of IGBT based Traction Converter for 3-Ph locomotives to be finalized after incorporating comments from RDSO.
5. Finalisation of revision of specifications of Traction and Aux. Converter as per RDSO suggestions.
6. Complete redundancy of one more WAP-7 locomotive 30451.
7. Release of software modified for incorporation of fail safe mode in Master Controller after field validation.
Source : click here
Image Link : click here
So, Loco Number 30446 is now have HOG Facility(In Jan 2016) and in this Month Loco Nos 30423,30454 & 30455 will be fitted with HOG Facility with 7775kVA double winding transformers. It's a really good news that HOG Facility is now fitted in 3-Phase Locos so in Future demand of EOG will be decreased.
1. Expression of interest (EOI) for development of Alternate Gear Drive System for WAP-5 locomotives uploaded on CLW website.
2. 3rd set of Alternate Drive Gear Arrangement for 160 Kmph supplied, by M/s Henschel/Germany, commissioned on Loco no. 30090. Loco sent to ELS/BRCY.
3. Prototype inspection of DPWCS for AC tap changer locos, developed by M/s Medha, carried out by CLW/RDSO from 11.01.2016 to 19.01.2016.
4. 2nd loco No. 30446 fitted with dual hotel windings alongwith Hotel load converter of M/s Siemens dispatched to ELS/GZB in Jan’16.
5. IGBT propulsion system of M/s Medha commissioned on Loco Nos. 31646, 31653, 31718, 30448, 30450 & 31672 in Jan’16.
Targets for the month of February’16
1. Commissioning of Hotel load converters supplied by M/s Siemens on Loco No. 30453, 30454 & 30455 alongwith 7775kVA double winding transformers.
2. 4th set of Alternate Drive Gear Arrangement for 160 Kmph supplied by M/s Henschel/Germany to be commissioned on Loco no. 30100.
3. Capacity-cum-Capability assessment of M/s ARC/Bangalore and M/s Trolex/Bangalore for the development of TCN compliant vehicle control system to be carried out by CLW/RDSO.
4. STR of IGBT based Traction Converter for 3-Ph locomotives to be finalized after incorporating comments from RDSO.
5. Finalisation of revision of specifications of Traction and Aux. Converter as per RDSO suggestions.
6. Complete redundancy of one more WAP-7 locomotive 30451.
7. Release of software modified for incorporation of fail safe mode in Master Controller after field validation.
Source : click here
Image Link : click here
So, Loco Number 30446 is now have HOG Facility(In Jan 2016) and in this Month Loco Nos 30423,30454 & 30455 will be fitted with HOG Facility with 7775kVA double winding transformers. It's a really good news that HOG Facility is now fitted in 3-Phase Locos so in Future demand of EOG will be decreased.
please wait...Translate to English
please wait...Translate to Hindi
"4th set of Alternate Drive Gear Arrangement for 160 Kmph supplied by M/s Henschel/Germany to be commissioned on Loco no. 30100."
That's WAP5 #101 for you :D. Waiting for its numbers to cross 100...
That's WAP5 #101 for you :D. Waiting for its numbers to cross 100...
please wait...Translate to English
please wait...Translate to Hindi
9147 views
3
Re# 1353010-79 Past Edits
Mar 04 2016 (10:30PM)
******* Conference for Development of Dual Mode Locomotive will be held at CLW on 19
03
2016 ********
******* Conference for Development of Dual Mode Locomotive will be held at CLW on 19
03
2016 ********
******* Conference for Development of Dual Mode Locomotive will be held at CLW on 19.03.2016 ********
Position of Ongoing Project regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW(Chittaranjan Locomotive Works)
In the last reply I described the Achievements in the month of January 2016 and Targets for the month of February 2016 . In this reply I will describe the Achievements in the month of February 2016 and Targets set for the month of March 2016:
Achievements...
more...
Position of Ongoing Project regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW(Chittaranjan Locomotive Works)
In the last reply I described the Achievements in the month of January 2016 and Targets for the month of February 2016 . In this reply I will describe the Achievements in the month of February 2016 and Targets set for the month of March 2016:
Achievements...
more...
in the month of February’16
1. Preparation of detailed specification and floating of Expression of Interest (EOI) for development of Dual Mode Locomotive on CLW website.
2. Incorporation and validation of complete redundancy of VCU processors with additional I/O cards on WAP-7 locomotive No. 30451.
3. 3rd loco No. 30454 fitted with dual hotel windings alongwith Hotel load converter of M/s Siemens dispatched to ELS/GZB in Feb’16.
4. Software modification for incorporation of fail safe mode in Master Controller implemented in WAP-7 locomotive No. 30451. Regular cut-in after successful field validation.
5. IGBT propulsion system of M/s Medha commissioned on Loco Nos. 30452, 31720, 30098, 31696, 31694 and 31747 in Feb’16.
Targets for the month of March’16
1. Commissioning of Hotel load converters supplied by M/s Siemens on Loco No. 30453, 30455, 30457, 30458, 30468, 30469 and 30471 alongwith 7775kVA double winding transformers.
2. 4th set of Alternate Drive Gear Arrangement for 160 Kmph supplied by M/s Henschel/Germany commissioned on Loco no. 30100.
3. Evaluation/Scrutiny of offers against Expression of interest (EOI) for the development of Alternate Gear Drive System for WAP-5 locomotives.
4. A pre-application conference to be conducted on 19.03.2016 at CLW with different firms for the development of Dual Mode Locomotive.
5. STR of IGBT based Traction Converter for 3-Ph locomotives to be finalized after incorporating comments from RDSO.
6. Finalisation of revision of specifications of Traction and Aux. Converter as per RDSO suggestions.
For more details please refer : click here
1. Preparation of detailed specification and floating of Expression of Interest (EOI) for development of Dual Mode Locomotive on CLW website.
2. Incorporation and validation of complete redundancy of VCU processors with additional I/O cards on WAP-7 locomotive No. 30451.
3. 3rd loco No. 30454 fitted with dual hotel windings alongwith Hotel load converter of M/s Siemens dispatched to ELS/GZB in Feb’16.
4. Software modification for incorporation of fail safe mode in Master Controller implemented in WAP-7 locomotive No. 30451. Regular cut-in after successful field validation.
5. IGBT propulsion system of M/s Medha commissioned on Loco Nos. 30452, 31720, 30098, 31696, 31694 and 31747 in Feb’16.
Targets for the month of March’16
1. Commissioning of Hotel load converters supplied by M/s Siemens on Loco No. 30453, 30455, 30457, 30458, 30468, 30469 and 30471 alongwith 7775kVA double winding transformers.
2. 4th set of Alternate Drive Gear Arrangement for 160 Kmph supplied by M/s Henschel/Germany commissioned on Loco no. 30100.
3. Evaluation/Scrutiny of offers against Expression of interest (EOI) for the development of Alternate Gear Drive System for WAP-5 locomotives.
4. A pre-application conference to be conducted on 19.03.2016 at CLW with different firms for the development of Dual Mode Locomotive.
5. STR of IGBT based Traction Converter for 3-Ph locomotives to be finalized after incorporating comments from RDSO.
6. Finalisation of revision of specifications of Traction and Aux. Converter as per RDSO suggestions.
For more details please refer : click here