I want to clear everyone's misunderstanding about delays of ER trains in ECR.
Since lhb are introduced to raise the mps of trains to 130 kmph but in kiul pnbe stretch in some places there are 52 kg rails which can't support 130kmph speed.So ECR is replacing 52kg rails with 60 kg rails.Theytake mega block almost everyday to replace the rais. Work is going on full swing to finish it as soon as possible.
Places which has 52 kg rails are
koo~Fut...
more...
Since lhb are introduced to raise the mps of trains to 130 kmph but in kiul pnbe stretch in some places there are 52 kg rails which can't support 130kmph speed.So ECR is replacing 52kg rails with 60 kg rails.Theytake mega block almost everyday to replace the rais. Work is going on full swing to finish it as soon as possible.
Places which has 52 kg rails are
koo~Fut...
more...
2 Posts
It is done to ease the congestion at Pnbe and is a good move by ECR.
It would be difficult for u to believe but the reality is that still some places of jaj pnbe sec has 52 kg rails i myself have observed it,but in this year they will be replaced to 60 kg.
Congestion is huge .. This section also needs separate lines for passenger and for superfast.
There should be third line between Ara and Mka to ensure proper run of trains.