Search Forum
Blog Entry# 1724523
Posted: Jan 30 2016 (01:14)
64 Responses
Last Response: Feb 04 2016 (19:47)
64 Responses
Last Response: Feb 04 2016 (19:47)
After preparing 2 logical lists,
/blog/post/1715016
/blog/post/1719429
Now its time for A bit of "OFF the Track" dream List.
Name of train (as per zone), both SF & m/e which deserves to...
more...
/blog/post/1715016
/blog/post/1719429
Now its time for A bit of "OFF the Track" dream List.
Name of train (as per zone), both SF & m/e which deserves to...
more...
59 Posts
If the present rake condition should be the sole criteria..then give them a new ICF rake or Model rake.
The sole purpose of LHB is to upgrade for a high speed performance.
The sole purpose of LHB is to upgrade for a high speed performance.
Continuing why was SK-12393/94 was given a LHB rake. It was doing good with ICF rake. The sole reason was popularity. The best train originating from PNBE gets the LHB for more comfort to its passengers.
And finally SK is running @ 130 kmph.
And finally SK is running @ 130 kmph.