Search Forum
Blog Entry# 1833973
Posted: May 05 2016 (20:26)
1 Responses
Last Response: May 06 2016 (00:48)
1 Responses
Last Response: May 06 2016 (00:48)
May 05 2016 (20:26) IMG09829-886143/♥♥Ajni Secunderabad Janshatabdi Exp♥♥
3313 net green flags 21 green per TrainCustom Ratings
Chetan~
Chetan~ 155 img trains 152 popular3313 net green flags 21 green per TrainCustom Ratings
Plz give flags and ur views for faster connection of
NED-NGP-ASR
NED-NGP-ASR
Reduce the speed between JUC and ASR and make this train to arrive ASR by 7 pm. Very aggressive schedule is given thats why this slack is needed at rear end for punctual arrival.
Reduce halt duration at NDLS to 10 minutes. NO need of 25 minutes of halt. Unnecessary Platform wastage is done by train.
Same reduce the halt time at Ambala cantt to 5 minutes. NO need of 10 minutes halt here.
And...
more...
Reduce halt duration at NDLS to 10 minutes. NO need of 25 minutes of halt. Unnecessary Platform wastage is done by train.
Same reduce the halt time at Ambala cantt to 5 minutes. NO need of 10 minutes halt here.
And...
more...