Search Forum
Blog Entry# 1842224
Posted: May 12 2016 (00:37)
2 Responses
Last Response: May 25 2016 (12:43)
2 Responses
Last Response: May 25 2016 (12:43)
Route between DLI and LKO is completely electrified. then why do not it is hauled by electric loco between DLI-LKO? It should sbe hauled upto LKO by electric loco and then from LKO it can be hauled by diesel loco.
Its a new deal & IR would await complete clearance of LKO-GKP nwk b4 commissioning E-Loco, as already it gets the same for ASR-DLI!!
Meanwhile, to decongest LKO, simply BBK can be made LC station for LKO bound train, as of now & same can be induced @ UTR for PBH-BSB bound trains!!
Meanwhile, to decongest LKO, simply BBK can be made LC station for LKO bound train, as of now & same can be induced @ UTR for PBH-BSB bound trains!!