Jun 16 2016 (18:03) 22388/Black Diamond Express (PT) | DHN/Dhanbad Junction (9 PFs) | HWH/WAP-7/30468
Rajz~
Rajz~ 3600 blog postsRail fanning at dhn.
Uploaded my pics of trip by 53061 bwn- hte pass. Came back at dhn stn at 15:30. So decided to do some rail fanning at dhn stn
1) RRI cabin of dhn. I believe that this is the first upload in iri.
2) construction work going on for the increase in pf level of platform no 2 & 3...
more...
Uploaded my pics of trip by 53061 bwn- hte pass. Came back at dhn stn at 15:30. So decided to do some rail fanning at dhn stn
1) RRI cabin of dhn. I believe that this is the first upload in iri.
2) construction work going on for the increase in pf level of platform no 2 & 3...
more...
5 Posts
In this case sir u are the one who posted the debut RRI dhn snaps. So u are the champ. Actually for me I have been to dhn by train after a long time in up direction from kmme today. When the train was entering pf5 I spotted it and I was super excited that o could not stop myself from taking a pic. Otherwise rest of the time while coming from ndls, usually get down at pf 1 and out of the stn and drive all the way by road.
No sir you are being modest!
Everybody knows that you are a champion railfan!
The knowledge that you and Sanjeev sir have about the NCR heartland is amazing and your discusions and trains suggestions especially DHN oriented are followed by me with great interest :)
Anyway did you find any board on the platform number 8?
Is...
more...
Everybody knows that you are a champion railfan!
The knowledge that you and Sanjeev sir have about the NCR heartland is amazing and your discusions and trains suggestions especially DHN oriented are followed by me with great interest :)
Anyway did you find any board on the platform number 8?
Is...
more...
Answer to your questions.
1) no stn board for pf no. 8
2) no. Asked one official. He told that that due to single line and two adjacent pf it would be very confusing. The other side(pf 8) was made so that it matches the level of new building on other side and the parking lot and ppl could directly board the train.
3)...
more...
1) no stn board for pf no. 8
2) no. Asked one official. He told that that due to single line and two adjacent pf it would be very confusing. The other side(pf 8) was made so that it matches the level of new building on other side and the parking lot and ppl could directly board the train.
3)...
more...
1. Great this would be valid point to counter those people who argue DHN having 9 platforms!
2. Great to hear that ! The platforms 2 and 3 were particularly low towards the HWH side.
3. Google supportedWifi scheduled to installed at 100 stations, DHN amongst them I believe!
3. Those spare rakes are not in good condition probably or would have been despatched...
more...
2. Great to hear that ! The platforms 2 and 3 were particularly low towards the HWH side.
3. Google supportedWifi scheduled to installed at 100 stations, DHN amongst them I believe!
3. Those spare rakes are not in good condition probably or would have been despatched...