Posted: Jul 22 2016 (15:18)

4 Responses
Last Response: Jul 22 2016 (17:15)
Rail News
5609 views
1

New Facilities/Technology
WR/Western
Jul 22 2016 (15:05)   Diamond Quadrilateral project of Indian Railways High speed rail plans accelerate
 

I.R.needrejuvenation~   949 news posts
Entry# 1937817   News Entry# 274485         Tags   Past Edits
Encouraged by the success of China in developing a vast high speed rail network, which is now the largest in the world, the Indian Railway is...

5071 views
0

Jul 22 2016 (15:18)
sachinature~
sachinature~   8566 blog posts
Re# 1937817-1               Past Edits
Will diamond quadrilateral cover pune and bengaluru en-route ?
Translate to English
Translate to Hindi

4364 views
0

Jul 22 2016 (15:36)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 1937817-2              
Firstly the current operating speed of Rajdhanis is 130/140 kmph and 75-85 kmph is average speed. Even if the speed is increased to 200kmph through improvement in track and rake, the average speed shall practically be 120-125kmph.
500km Mumbai-Ahmedabad Bullet train project is costing 1 lac crore Rs. Quadrilateral (i.e. interconnection of 4 metros) shall involve construction of about 10000 kms of track shall cost upward of 20lac crore Rs., which leave aside Indian Railways, even the Indian Economy can not bear.
The Mum-Ahm project has become possible due to extremely
...
more...
lucrative loan extended by Japan (JICA) to the tune of 81% at 0.1% interest rate with15 year payment moratorium, and 50 year payback period! Even this most lucrative route of IRlys will most probably find it difficult to get enough passengers, which according to a study must be above 1 lac per day! Passengers in such bulk is possible only if the fares are affordable to middle class passengers, which presently is not the case. Unless Indian Economy grow at astonishingly fast rate in coming years with benefits substantially percolating to middle class and lower class, high speed quadrilateral is a dream! Passengers in such bulk is possible only if the fares are affordable to middle class passengers, which presently are definitely not affordable.

Translate to English
Translate to Hindi

4688 views
1

Jul 22 2016 (16:11)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 1937817-3              
Mumbai-Chennai Arm Shall be definitely touching Pune. Pune could have been covered with Ahmedbad-Mumbai project,was but left out to contain costs. Nothing had been heard so far about the exact route towards Chennai, which is expected to be more or less parallel to the existing line to avoid land acquisition to the extent possible, thanks to extreme difficulties if land acquisition. Actual route depend a lot on what the survey report and market study says.
My wish is to go elevated over the Mumbai--(980) Bangalore--(+350=1330) Chennai Expressway/ Highway. This route may be 1330 km long about 50 km longer for Chennai (1280 km) and about 230 km shorter for Banglore (1210km) than the existing rail route may be a better option
...
more...
from point of view of better area-coverage, revenue & patronage also. Bangaluru probably have more air traffic than Chennai and higher number of passengers are expected from Bengaluru.
Historically there were 4 Major cities- Kolkata-Mumbai-Chennai-Delhi. At the time of independence probably Madras was more populous than Delhi. (1971 figures as far as I remember are 72-59-25-36 lacs respectively.). From national integration point of view, these 4 cities suited well as 4 Metros of India.
But today the above Metro Club is irrelevant. Today there are 3 metros around and above 1.5 crore i.e. Mumbai, Delhi, Kolkata. Next is cluster of 4 in 75lacs-1 crore band i.e. Chennai, Bangaluru, Hyderabad, Ahmedabad. Then Pune, Surat are 50lacs+ and so on. When our leaders speak of metro cities of nation, they say Chennai to represent south. But today Bangalore and Hyderabad had grown up and are catching up very fast and cannot be neglected in matter of representing south India.

Translate to English
Translate to Hindi

4818 views
0

Jul 22 2016 (17:15)
sachinature~
sachinature~   8566 blog posts
Re# 1937817-4               Past Edits
I wish if this follows existing line, then mumbai - chennai DQ route should go via pune-hubballi-bengaluru or if it goes via pune-wadi-guntakal then definitely they will skip bengaluru and follow the kadapa route and bengaluru will be out of DQ
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy