Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Western Railway :- Dil Bole Baar Baar WR. WR - Abdul Rehman

IRI is in Maintenance Mode. Blog Postings and other site edits will not work for about 5 minutes.
Search Forum
<<prev entry    next entry>>
Blog Entry# 1957107
Posted: Aug 10 2016 (07:46)

15 Responses
Last Response: Aug 12 2016 (15:51)
Rail Fanning
40340 views
37

★★★
Aug 10 2016 (07:46)   15656/Shri Mata Vaishno Devi Katra - Kamakhya Weekly Express | DBG/Darbhanga Junction (5 PFs) | NGC/WDM-3D/11483
 
Don2565~
Don2565~   2509 blog posts
Entry# 1957107            Tags   Past Edits
SVDK-KYQ Express Arrived Darbhanga Junction Hauled By GD WDM3A + Dead NGC 3D !!
On Right Side SPJ WDP4D With Bihar Sampark Kranti SF Express Can Be Seen in the Pic !!
Clicked On :- 04.08.16
Note :- Mist Watch The Arrival Video 😊
Translate to English
Translate to Hindi

12 Posts

18329 views
0

Aug 11 2016 (00:21)
TheDarkLord~
TheDarkLord~   10265 blog posts
Re# 1957107-13              
All these are draw backs of acquiring foreign made Locomotives which have been designed and built according to the condition over there. Why don't the RDSO and Indian Railways design and built Ingenious 3 phase electric locomotive? Aren't they capable of doing that!!!
Translate to English
Translate to Hindi

17848 views
0

Aug 11 2016 (00:24)
Subrat Shrivastava   29709 blog posts
Re# 1957107-14              
mujhe to yahi lagta hai
Translate to English
Translate to Hindi

17362 views
0

Aug 11 2016 (00:28)
Ben_Kenobi~
Ben_Kenobi~   4222 blog posts
Re# 1957107-15              
the people who design are the same guys who graduated copying each other's assignments, so they continue the same tradition there :P
On a more serious note, we don't have the technical know how on that, for some reason. One of the most critical component, the electric drives involved in control of TM, are still imported (this is true in every field that uses drives, they are always imported, no local manufacturing)
there are other issues too, but i am not completely aware of this, but it boils down to this: we don't
...
more...
have the requisite technical know how, for some reason.

Translate to English
Translate to Hindi

16850 views
0

Aug 12 2016 (15:51)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 1957107-17              
More than that, this is a problem with collaboration between IR and the design companies. The original WAM1, WAG1 and IR's most successful loco, the ALCO WDM2 were all imported technologies. The WAM4 was very successful because of the ALCO tri-mount bogies. And IR developed these imported technologies later on.
A complete design from scratch takes a decade for a new traction technology, by which time it might even become irrelevant. It is a common practice to get the initial models from a company that is already well versed with said technology. Even the WAP5 was custom built for IR, with a separate European version also. In this way DLW has done an excellent job of collaboration,
...
more...
as can be seen with the EMD's and the WDM3D.
CLW on the other hand had some lapses with the 3 phasers and also ignored the WAP4 even though it was completely their own design.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy