Madurai: The Madurai - Chennai Egmore Pandian Express left Madurai junction on Monday night fully decorated with brand new Linke Hofmann Busch rake with a mixed...
30 Posts
tough pa, ambaturaila stationku vella poidum, 22 enough. they can make mahal daily with 8 UR coaches so that passengers can utilize that.
Don't think so. When railways made 13 coach train to 21 coach rake train in one budget announcement why is it not possible to make 24-26 within a year?
I am not proposing anything new. This was made announcement in budget. Railways would have done feasibility before announcing it in budget.
I am not proposing anything new. This was made announcement in budget. Railways would have done feasibility before announcing it in budget.
length of sidings+length of platforms is an issue.
Had the platforms/yard lines already been long enough to handle 30 coaches then increasing to 26 coach wouldn't be an issue, in that case only the production capacity of coaches would be a limiting factor, this isn't the case sadly and in many cases trains barely fit on Pf when 24 coach long.
there are certain PF's though which have heard have been extended, so the process may not take very long, but instantly it won't happen.
it...
more...
Had the platforms/yard lines already been long enough to handle 30 coaches then increasing to 26 coach wouldn't be an issue, in that case only the production capacity of coaches would be a limiting factor, this isn't the case sadly and in many cases trains barely fit on Pf when 24 coach long.
there are certain PF's though which have heard have been extended, so the process may not take very long, but instantly it won't happen.
it...
more...
Even on important stations like LKO, out of 7 only 4 platforms are capable to accommodate a 24 coach ICF or 22 coach LHB and here are talking about 26 coach Rake. It will definitely need major infrastructural overhaul.
this is true for many major stations.
Increasing length of PF isn't just a simple matter of extending PF length, lot of work goes in making new turn outs, relaying the cables (interlocking) connected to signals on turn outs, changing position of signals itself etc. the whole process can be time consuming, especially if done in major cities with busy schedules.
Increasing length of PF isn't just a simple matter of extending PF length, lot of work goes in making new turn outs, relaying the cables (interlocking) connected to signals on turn outs, changing position of signals itself etc. the whole process can be time consuming, especially if done in major cities with busy schedules.