Search Forum
Blog Entry# 1969127
Posted: Aug 21 2016 (17:35)
32 Responses
Last Response: Aug 24 2016 (01:09)
32 Responses
Last Response: Aug 24 2016 (01:09)
Madurai: The Madurai - Chennai Egmore Pandian Express left Madurai junction on Monday night fully decorated with brand new Linke Hofmann Busch rake with a mixed...
19 Public Posts - Sun Aug 21, 2016
7 Public Posts - Mon Aug 22, 2016
2 Public Posts - Tue Aug 23, 2016
1 Public Posts - Wed Aug 24, 2016
length of sidings+length of platforms is an issue.
Had the platforms/yard lines already been long enough to handle 30 coaches then increasing to 26 coach wouldn't be an issue, in that case only the production capacity of coaches would be a limiting factor, this isn't the case sadly and in many cases trains barely fit on Pf when 24 coach long.
there are certain PF's though which have heard have been extended, so the process may not take very long, but instantly it won't happen.
it...
more...
Had the platforms/yard lines already been long enough to handle 30 coaches then increasing to 26 coach wouldn't be an issue, in that case only the production capacity of coaches would be a limiting factor, this isn't the case sadly and in many cases trains barely fit on Pf when 24 coach long.
there are certain PF's though which have heard have been extended, so the process may not take very long, but instantly it won't happen.
it...
more...
2 Public Posts - Wed Aug 24, 2016