Full Site Search  
Tue Feb 21, 2017 20:25:09 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

<<prev entry    next entry>>
Blog Entry# 1976995  
Posted: Aug 31 2016 (11:54)

3 Responses
Last Response: Aug 31 2016 (12:10)
  
General Travel
0 Followers
519 views
Aug 31 2016 (11:54)  
 

srinivasvasanthi   3622 blog posts   13 correct pred (50% accurate)
Entry# 1976995            Tags   Past Edits
Vijayawada Jn also operated with more congestion.Anew line TENALI to Gudivada with electrification have to be constructed to relieve congestion of Vijayawada jn.

  
325 views
Aug 31 2016 (12:00)
Boxer Bhai~   38141 blog posts   12664 correct pred (61% accurate)
Re# 1976995-1            Tags   Past Edits
No use

  
353 views
Aug 31 2016 (12:02)
Surat Mumbai Tejas Soon*^~   30342 blog posts   67727 correct pred (81% accurate)
Re# 1976995-2            Tags   Past Edits
Post only once not more then 1 time it's called spam here

  
Aug 31 2016 (12:10)
A good day ahead~   2313 blog posts
Re# 1976995-3            Tags   Past Edits
The congestion problem is more in BZA-VSKP sector than BZA-MAS and north-bound traffic at BZA is managed well due to PF arrangements. And BZA-GDR 3rd line has been commissioned, which can further improve things.
Your proposal is also useful, once the proposed port corridor in AP is sanctioned. A connection between MTM-BPT bypassing BZA is part of the plan.
Scroll to Top
Scroll to Bottom


Go to Desktop site