Search Forum
Blog Entry# 2002052
Posted: Sep 25 2016 (20:05)
2 Responses
Last Response: Sep 25 2016 (20:26)
2 Responses
Last Response: Sep 25 2016 (20:26)
If operationally feasible, then this train should be extended up to LKO....
IR should withdraw such train, for which extension is required, and 'reintroduce the train with new destination and origin with better coach composition and timing, to utilise the available resource to optimal level. To save on cost, slot, etc.
Idea is good, but it will require another rake for operating it from LKO.