Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

The train is a small world moving through a larger world - Niraj Kumar

Search Forum
<<prev entry    next entry>>
Blog Entry# 2011963
Posted: Oct 05 2016 (12:18)

16 Responses
Last Response: Oct 18 2016 (14:08)
Rail News
29477 views
4

New Facilities/Technology
CR/Central
Oct 05 2016 (11:59)   Daund-bound trains to run on electricity
 

AW25392~   1107 news posts
Entry# 2011963   News Entry# 282183         Tags   Past Edits
Diesel locomotives will be phased out in the PuneDaund section of the Central Railway .
The...

11 Posts

12178 views
3

Oct 06 2016 (19:30)
Manoj_Pune
Manoj_Pune   262 blog posts
Re# 2011963-12              
Image File shows the design on the Daund Bypass.
Translate to English
Translate to Hindi

13251 views
0

Oct 06 2016 (19:55)
dnyaneshwar   162 blog posts
Re# 2011963-13              
या पेक्षा दौंडहून खोरवडी मार्गे मार्ग केल्यास साधारण ३ किमी च मार्ग होईल दौंड स्थानकास ही उपयोग होईल व वेळ ही वाचेल मनमाड अंकाई प्रमाणे इथेही सोय करावी .
Translate to English
Translate to Hindi

11739 views
1

Oct 17 2016 (11:04)
Manoj_Pune
Manoj_Pune   262 blog posts
Re# 2011963-14              
How do we get these suggestions across to the ministry?
Also one more suggestion until the bypass materializes. Railways should have separate engines for Pune to Daund and Daund to Manmad section for a train. As soon as train coming from Pune stops at Daund, there should be a parallel process of detaching the engine towards Solapur end of the train and attaching another engine at Pune/Manmad end of the train. This way they can reduce the turnaround time at Daund Junction from some 20-30 min to just 5 min. The detached engine can then be attached for next train which has a reversal at Daund.
Translate to English
Translate to Hindi

12767 views
0

Oct 17 2016 (11:24)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 2011963-15              
An electric trip shed ( ETS) will be needed for Daund to hold so many locomotives as to provide a new loco for every train reversing in DD. As of now, only the incoming locos will be reversed to the other end of the train. As both Pune and MMR are quite close to Daund, and already have all facilities for loco changes and have trip sheds, there won't be any significant change in operations in DD until improvements are made in the DD-Wadi section.
Translate to English
Translate to Hindi

21409 views
2

Oct 18 2016 (14:08)
Manoj_Pune
Manoj_Pune   262 blog posts
Re# 2011963-16              
There are 26-30 train reversals each day at Daund. The assignment of locos should be done in such a way that not more than 2 locos would be required to be held up. They should smartly manage this. At Karjat, a train leaves in 3 minutes after attachment of bankers. So it can be this efficient.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy