Desiincanada~ 1274 blog postsElectrification status of gondia ballarshah section
Pic taken at nagbhir,see the erected electric poles and lots of cement slabs for doubling.
Noticed that the poles are erected with wiring throughout the route
Pic taken at nagbhir,see the erected electric poles and lots of cement slabs for doubling.
Noticed that the poles are erected with wiring throughout the route
so hope before the opening of JBP-BTC-G route G-BPQ route will be fully electrified and may b doubled so this will also give hope for the fast electrification of JBP-BTC-G route also so that power change problems can be avoided
plz post more pics of G-BPQ ongoing electrification work if possible
not possible as of now
i actully had planned to make a detailed coverage out of that route but i was sooo tired that i coudnt even stand properly during that time.
this pic was actully taken from the inside of coach.
all i can say is that gondia bpq will see Eloco as early as 2017,bcoz all wiring has been completed except at...
more...
i actully had planned to make a detailed coverage out of that route but i was sooo tired that i coudnt even stand properly during that time.
this pic was actully taken from the inside of coach.
all i can say is that gondia bpq will see Eloco as early as 2017,bcoz all wiring has been completed except at...
more...
Glad to see the progress but feeling sad as I will greatly miss twin ALCO rampage of 12851/2.