Jayashree^ 51390 news posts
PowerGrid to electrify 761-km rail track at Rs 889 cr "The Ministry of Railways has allotted 761 kms of railway route electrification work at cost of...
Baatein jyada kaam kum.
If 24000 RKMS are to be electrified in 5 years, then the role of taking pilot project taken by PGCIL does not have much significance because, after 5 yrs not much tracks (about 9000 KMS only) shall be left for electrification.
Chhindwara-Nainpur-Mandla is presently NG and still under conversion, prioritization of this route is surprising.
Handing over of letter...
more...
If 24000 RKMS are to be electrified in 5 years, then the role of taking pilot project taken by PGCIL does not have much significance because, after 5 yrs not much tracks (about 9000 KMS only) shall be left for electrification.
Chhindwara-Nainpur-Mandla is presently NG and still under conversion, prioritization of this route is surprising.
Handing over of letter...