Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

SDAH NDLS Duronto: দৌঁড়ে চলো , দিল্লি চলো - PPG

Search Forum
<<prev entry    next entry>>
Blog Entry# 2047292
Posted: Nov 03 2016 (23:07)

16 Responses
Last Response: Nov 07 2016 (17:14)
Poll
6191 views
20 votes
0

Nov 03 2016 (23:07)  
ps14003
ps14003   238 blog posts
Entry# 2047292              
According to Financial express, Talgo, the Spanish manufacturer of high-speed trains, is all set to lease out 2-5 trains to Indian Railways in less than a year’s time. Sources with knowledge of the matter told FE Online, that Suresh Prabhu-led Indian Railways is awaiting a final approval of Niti Aayog, before officially telling Talgo to lease out its trains to India. Once the contract is signed, it will take Talgo less than a year to supply anywhere between 2-5 trains. “The train is likely to be of around 26 coaches each, so that the total capacity matches that of the existing Shatabdis,” sources told FE Online.
Possible routes ------
Translate to English
Translate to Hindi
NO vote
Delhi - Mumbai
65%
13
Delhi - Amritsar
0%
0
Mumbai - Ahemdabad
10%
2
Delhi - Lucknow/Jaipur/Bhopal/Chandigarh
25%
5

11 Posts

2237 views
0

Nov 06 2016 (15:00)
Subrat Shrivastava   29709 blog posts
Re# 2047292-12              
Talgo to india impossible hai ye baat saaf hai.Agar tracks ka mps har section ka increase kar de to LHB coach se hi high speed train chala sakte hai aur ye succesful bhi hogi
Translate to English
Translate to Hindi

2732 views
0

Nov 06 2016 (15:30)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Re# 2047292-13              
So many have voted for NDLS-BCT.
-
If I am not wrong, doesn't Talgo have only sitting arrangements? So will people, who can afford to travel by this costly train, prefer 12 hours of sitting or would they take the shorter duration flight?
Translate to English
Translate to Hindi

2095 views
1

Nov 06 2016 (16:05)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 2047292-14              
The interior seating arrangements can be altered easily enough. All that matters is the ability to run these rakes at higher speeds on our tracks. Interior systems and other cosmetic changes do not matter much to the train's operations.
Most important thing is that Talgo operations will cost lesser than normal LHB coach trains. It is very crucial that IR follow this and price the Talgo on the same rates as the Raj or Shatabdi class ( without the flexi fare) or a marginal increase to recover initial rake costs. If IR prices them too high, it will defeat the whole purpose of getting the rakes here in the first place.
...
more...
If they guarantee an overnight travel, then they can attract quite a bit of crowd. Many premier still have a good rush for AC 1st class and between major cities even though it costs as much as a flight ticket simply because people prefer traveling overnight with a comfortable sleep than waking up early morning to catch an early morning flight. I've regularly experienced this with SBC Raj between SBC and SC. A lot of passengers take Raj as they prefer having a comfortable sleep rather than waking up at 4 AM and catching a morning flight.

Translate to English
Translate to Hindi

2588 views
1

Nov 07 2016 (16:24)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 2047292-15              
IR shall lose money if they convert 21 LHB coached (500M long) Mum/HWH Rajs into 26 Talgo coached (340M long) rake or replace LHB with Talgo in shatabdies.
It will be better if Raj/Shat with LHB coaches are operated at 160kmph.
IF current MUM raj is operated at 130kmph and given overriding priority which was given to Talgo train during trials, it can easily save 1-1.5 hrs i.e. do journey in 14.5- 15 hrs. And if speed is kept 160kmph like Gatiman, 12-13 hrs seems possible.
Huge
...
more...
expenditure in Talgo rake at this juncture, with IR in severe cash crunch is not justified when the job can be done without any capital expenditure.

Translate to English
Translate to Hindi

2042 views
0

Nov 07 2016 (17:14)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 2047292-16              
It will be a rather fine line when it comes to the earnings. The train capacity may decrease by moving to a Talgo rake. But at the same time there would be considerable savings in Energy and maintenance costs ( Talgo is projecting about 30%, but it will be less that that). With that included, the earnings may not take a big hit.
Talgo may not be a viable alternative at the outset for the Mumbai Raj, or the Bhopal Shatabdi due to the loss in capacity. But it will be a better alternative for many of the Shatabdi's running on non-high speed routes like MYS/SBC-MAS, Pune-SC etc.
...
more...
Actually a huge capital investment would be required for upgrading routes to run the Mumbai raj at 160kmph. For the HWH and Mumbai routes alone, IR has projected an estimate of 10,000 cr for upgrading the routes to be 160kmph fit as it would require actual relaying of tracks, changes in alignment in some places and many more large scale works to enable the long, heavy rakes to run at high speeds. It is not a short term project.
On the contrary, Talgo rakes will require a much smaller expenditure ( for initial rake purchase and setup of maintenance facilities) and can be used on any of the trunk routes and most of the important non-high speed routes with very minor modifications on these routes. They can run at higher speeds on existing routes and will reduce maintenance and energy costs considerably.
But Talgo is only a short term solution.More importantly, the LHB technology itself is now over 25 years old and stainless steel coaches worldwide have been replaced with more efficient, lighter aluminum and alloy coaches. By the turn of the decade, IR will have to move to these newer ones to reduce operational costs ( and the savings it would get are considerable). Trying out Talgo rakes would go a long way to help IR to transition in to the next generation.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy