Search Forum
Blog Entry# 2049328
Posted: Nov 05 2016 (16:14)
4 Responses
Last Response: Aug 22 2018 (18:19)
4 Responses
Last Response: Aug 22 2018 (18:19)
New Facilities/Technology
WR/Western
I.R.needrejuvenation~ 949 news posts
CONCOR dispatches over 7,000 containers Mhow- Manmad rail line will help in speedy transportation of containers to all ports
Indore:...
Indore:...
Rate of Return (RoR) of a project is the single most important parameter which help decide whether the project shall be prifitable/desired or not. It should be a notch above (3-5%) above the rate of inflation so that the project can lay back the cost of construction in due course of time. It should be at least equal to or more than 13%.
One party (IR) pegging RoR of IND-MMR NL project at 9-10 % and other party (Mr. factual ?) claiming it to be 30.7%, are making a mockery of whole project implementation process.
It...
more...
One party (IR) pegging RoR of IND-MMR NL project at 9-10 % and other party (Mr. factual ?) claiming it to be 30.7%, are making a mockery of whole project implementation process.
It...
more...
Yes apart from container traffic, this project will give connectivity to backward/neglected areas in both MP and Maharashtra
Mhow - Akola BG coversion works have to be speeded up with Electrification for connecting Mumbai and southern states as alternative route for the over congested Bhopal - Nagpur North - South route.