Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Sri Jagannath Express is as good as Abada Prasad - Brandon Buffard

Search Forum
<<prev entry    next entry>>
Blog Entry# 2067186
Posted: Nov 21 2016 (18:59)

5 Responses
Last Response: Nov 22 2016 (05:39)
Rail News
3456 views
0

IR Affairs
NR/Northern
Nov 21 2016 (17:46)   जिस पटरी पर 100 ट्रेनों को दौड़ाया जा सकता है उसपर 200 ट्रेनें चल रही हैं।भारी पड़ रही यह लापरवाही

Ehtram Husain~   10595 news posts
Entry# 2067186   News Entry# 286295         Tags   Past Edits

2583 views
2

Nov 21 2016 (18:59)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 2067186-1              
Very Sad news which give rise to several thought provoking questions, that are very much relevant at this juncture, at the back drop of the recent spate of accidents/derailments-
1-Why the situation of running double the number trains than the capacity of the track exist today?
2-Did the situation/problem developed over night?
3-How this situation could have been avoided?
We
...
more...
have to go deep into the history of IR to expose the root causes, which today are buried under the numerous layers of history, that even the resourceful Indian media is not able to see. Every body wants a escape goat for every accident/ wrong happenings.
1-1)IR was one of the leading rail network at the time of independence by its vastness, traffic, its technology and by its financial condition, at the time of independence.
1-2)Gradually, IR became a battle ground for populism, vote bank politics, corruption etc. As a result, Inefficiency bred in the organisational work culture. Financial wisdom was often up for a toss.
1-3)Lower class ac Passenger fares (over 95% of total paxs) were not increased in proportion to the rise in input costs/inflation, just to become champion of poor and secure their votes.
1-4)To make up for the lost revenue, taking benefit of monopoly over rail transport, IR indiscriminately increased freight fares (take care of inflation), as a result the freight switched over to trucks and IR lost two thirds of its market share and revenue.
1-5)Upper class fares were also increased beyond proportion leading to diversion of profit giving upper class paxs to airlines/ cars/ luxury buses.
1-6)Only the highly subsidised lower class passengers continue to swell in number resulting in poor revenue surplus with IR.
1-7) As a result, no money was left with IR, for the necessary replacement of overaged assets/ worn out equipments/ additional lines necessary for IR to ensure safety and higher traffic.
1-8)Almost every RM (barring a few) were just busy doling out goodies by way of concessions, schools, colleges, hospitals, new trains (often unwanted and loss making) to their constituencies/ states, splurging the scarce surplus resource of IR on constructing new lines, gauge conversions etc in his/her home state. This practice assumed draconian dimensions with advent of coalition politics and rise of regional parties.
1-9) Funds which must have gone into the decongestion of the highly saturated trunk and other routes were diverted to nondeserving sundry projects in VIP area/state. A large number of passenger trains were introduced on the already congested routes making operation difficult and unsafe. NDLS-HWH is the biggest sufferer in this respect and hence the most accident prone today, in spite of much higher investment as compared to other trunk routes.
2-1) The situation is a result of poor capacity augmentation/modernisation, financial imprudence, very strong departmentalism, Very poor record in adopting new technology/ management principles/ financial methods and extreme political expediency during the last 7 decades.
2-2) Biggest irony is those who did maximum damage to IR/nation and are very much responsible for this (bad) condition of IR/nation, does not lose any opportunity to point fingers at IR and give a lot of advice at the drop of a hat. This is state of affairs in our country.
3-1) Political expediency can be reduced but cannot be eliminated in current set up but can be reduces substantially.
3-2)Unless the private sector is gradually involved in railway operation and given a level playing field with IR, i.e. without bringing competition in railway operation in India, not much betterment can be expected. It is a difficult task but can be achieved if done with right spirit, intention ans in planned gradual steps. Monopoly always breed inefficiency esp. in a huge govt. organisation like IR.
3-3)If IR is competing with the pvt train operators, political forces shall not have much liberty for undue interference, because they cannot forget their responsibility to disburse salary to employees. IR shall have no option but to change and stand up before the pvt, operators. 3-3-4)This thing is already being done by govt/PSUs like BSNL, Air India, NTPC, OIL, SAIL, Road ways, Govt owned Banks etc. who have improved a lot are successfully competing with pvt sector. The developmental/augmentation works may be done by the efficient pvt sector players.
3-5) It is time to stop treating the railways as a holy cow, and liberate the sector as done earlier in telecom, power, steel, petro-chemical etc. sectors which has developed leap and bounds over the years due to competition.

Translate to English
Translate to Hindi
Show AI Response

2540 views
0

Nov 21 2016 (19:29)
Hiiiiiiii
Hiiiiiiii   9797 blog posts
Re# 2067186-2              
Much route pe over saturation hai much new route under utilized hai....ysko balanced karna padega.
Translate to English
Translate to Hindi
Show AI Response

2590 views
0

Nov 21 2016 (19:37)
Hiiiiiiii
Hiiiiiiii   9797 blog posts
Re# 2067186-3              
Via Sitapur cantt & via chandausi route ko double electronic karna jaruri hsi taki alternative route nikle
Translate to English
Translate to Hindi
Show AI Response

1931 views
0

Nov 21 2016 (23:33)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 2067186-4              
New routes were constructed to suit the political convenience of the politicians rather than the operational & financial convenience of IR. New routes should have been constructed to form alternate routes to the saturated trunk routes but were constructed to serve VIP area as a socially desirable project.
Translate to English
Translate to Hindi
Show AI Response

3711 views
0

Nov 22 2016 (05:39)
deepak.yerr~
deepak.yerr~   5993 blog posts
Re# 2067186-5              
The time when NHAI was established to 4 lane the gden quadrilateral they should have incorporated a organization for IR to increase saturated line to three and four where ever necessary and increased fares in a gradual manner according to costs involved and improve signalling systems increasing the min speed on changi ng points to 30kmph would have done a lot of change in IR. We are lagging by 20 yrs now and this minister realized the need of augmentation and announced many projects but work is yet to start.
Translate to English
Translate to Hindi
Show AI Response
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy