Search Forum
Blog Entry# 2070265
Posted: Nov 24 2016 (20:22)
2 Responses
Last Response: Nov 24 2016 (20:45)
2 Responses
Last Response: Nov 24 2016 (20:45)
It can be extended to GDR/MAS/TPTY because entire mas-gdr-nlr-ogl-ngnt-bza sec have no teain directly to mumbai(which is commertial capital of india).they have to travel to either to BZA or rU or MAS to go to mumbai
Anandwan Express has a turn around time of 11hrs 45min at Kazipet. Atmost it can be extended upto GNT comfortably without disturbing the current timings and rake.
WL-BZA in 3hrs 30min with an average of around 60kmph and from there one hour to GNT, totaling 4hrs 30min
right now it's 06.45 @ KZJ, lets assume it reaches GNT by 11.15hrs and departs 14.00hrs, it can continue in it's regular path from WL.
WL-BZA in 3hrs 30min with an average of around 60kmph and from there one hour to GNT, totaling 4hrs 30min
right now it's 06.45 @ KZJ, lets assume it reaches GNT by 11.15hrs and departs 14.00hrs, it can continue in it's regular path from WL.