honorable drm of kota replied to my tweet, that was "pole fabrication work started after it installation will be done"
i want to know that does pole fabrication mean while there is no construction work like pole fitting at platform 1,2 and 3 is going on currently at station? so are poles making inside any building of station?
i want to know that does pole fabrication mean while there is no construction work like pole fitting at platform 1,2 and 3 is going on currently at station? so are poles making inside any building of station?
2 Public Posts - Tue Dec 06, 2016
1 Public Posts - Thu Dec 15, 2016
pole fabrication ka kam chal to rha hai jaisa drm ne bola or november me h start ho gaya hoga ab teeno platform ke liye poles banege man lo ek pf 24 coach ka hai to ek pf ke liye kam s kam 15 poles banege is hisab sr teen pf ke liye 45 poles ab usme time to lgta hi hai...or idhar waitinh hall complete ho gya hai ab thoda sa kam baki hai uska mujhe lgta hai railway waitinh hall or cgs ka inaugration ek sth krayega isliye cgs me delay kr rhe