Search Forum
Blog Entry# 2083478
Posted: Dec 07 2016 (18:32)
1 Responses
Last Response: Dec 08 2016 (07:47)
1 Responses
Last Response: Dec 08 2016 (07:47)
Dec 07 2016 (18:32) 15662/Kamakhya - Ranchi Weekly Express (PT) | KYQ/Kamakhya Junction (4 PFs)
SILLIILLOOLODHMAPISKALOOP
SILLIILLOOLODHMAPISKALOOP 637 blog postsMy first proposal agreed & initiated by CRB & RailMinIndia - the RNC 15661 KYQ 15662 RNC Express
crossing NaraNarayan Setu, a Rail+Road Bridge # 355 on River Bramhaputra @ 50.21 River Level with different span sizes
Naranarayan Setu (Assamese: নৰনাৰায়ণ সেতু) (IPA - nɑ:rəˈnərɑ:jənə/nɑ:rəˈnəraɪjənə ˈseɪtu:) is the third bridge to have been constructed over the Brahmaputra River in Assam, India. It is a double-deck bridge with a railway track on the lower deck and a road on the upper deck. It has a length of 2.284 kilometres and connects Jogighopa, a town...
more...
crossing NaraNarayan Setu, a Rail+Road Bridge # 355 on River Bramhaputra @ 50.21 River Level with different span sizes
Naranarayan Setu (Assamese: নৰনাৰায়ণ সেতু) (IPA - nɑ:rəˈnərɑ:jənə/nɑ:rəˈnəraɪjənə ˈseɪtu:) is the third bridge to have been constructed over the Brahmaputra River in Assam, India. It is a double-deck bridge with a railway track on the lower deck and a road on the upper deck. It has a length of 2.284 kilometres and connects Jogighopa, a town...
more...