Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFans - the future of journalism

Search Forum
<<prev entry    next entry>>
Blog Entry# 2086530
Posted: Dec 10 2016 (13:28)

26 Responses
Last Response: Dec 11 2016 (11:00)
Travelogue
54969 views
12

★★
Dec 10 2016 (13:28)   DBRG/Dibrugarh (4 PFs)
guest
Entry# 2086530            Tags  
Shatabdi Express to Start Operations in Assam Soon
-------------------------------------------------- ----------
When it comes to speed, the Shatabdi Express had no competition. It ruled the roost as the fastest train in India for a few good years, before being overtaken by newbie The Gatimaan Express. And now if reports are to be believed, Assam will get not one, but two Shatabdi Express trains.
The
...
more...
two Shatabdi Express trains are expected to ply along the Tinsukia-Guwahati and Naharlagun-Guwahati routes respectively.
Shatabdi Express trains are a series of superfast passenger trains operated by Indian Railways to connect metro cities with other cities important for tourism, pilgrimage or business. Shatabdi Express are day-trains and they return to the station of origin the same day.
# More Initiatives
In addition to that, a new fully AC 3-tier train will also start operations from Guwahati to Bangalore via Kolkata. A new train from Agartala to Kolkata is also on the cards. Besides that, a host of new initiatives are also being planned to provide better connectivity and facilities to the people of the Northeast.
Initiatives like upgradation of the Guwahati and Agyathuri Railway stations to world class stations are already underway under Public-Private Partnership (PPP) mode. Further, the Guwahati station is expected to have an executive lounge in line with airports. Moreover, the work on doubling the railway tracks in Assam would begin from Hojai on September 12.
#Second Railway Bridge at Saraighat
Not only that, the survey pointed out the possibility of a second railway bridge at Saraighat (over the Brahmaputra in Guwahati), with new rail routes between Salona and Khumtai, Sivasagar and Jorhat and Tezpur and Silghat. The Railways are also considering setting up a bottled drinking water plant under the RailNeer brand in Jagiroad. Land is currently being surveyed for the same.
At present, Assam currently has the Jan Shatabdi Express connecting Jorhat with Guwahati and three Rajdhani Express trains connecting Dibrugarh with New Delhi. The introduction of two Shatabdi Express trains is expected to improve railway connectivity in the State.
-------------------------------------------------- ----------Link: click here
Date: 06 September 2016
By : Eclestic Northeast

Translate to English
Translate to Hindi

21 Posts

9070 views
0

Dec 11 2016 (10:41)guest
Re# 2086530-22              
Chalo 110 hai No Problem par Average to Slow hai
FZR Shatabdi to First Leg mei hai Fast uske baad 75-80-90-100 Knps hai
BTI se FZR hi 90-100 Kmph hai
Translate to English
Translate to Hindi

21658 views
0

Dec 11 2016 (10:43)guest
Re# 2086530-23              
Agree but #Divyanshu mai to GHY DBRG ka Section dekh raha hu
Kyuki usi Roite mei Chalegi na
Translate to English
Translate to Hindi

9212 views
1

Dec 11 2016 (10:45)
TouristerDivyanshu^~
TouristerDivyanshu^~   172564 blog posts
Re# 2086530-24              
@2086530-23  @guest
But comparing end to end hoti h, as short distance train have less slack but a long distance train is having more slack thats why they get slower in last section, ghy rajdhani raat me chlti h us section me aur as per ur blog geographical conditions h isly trains high sped ki nhi h so raat me aur b problem hoti h due to forest animals etc, while Shatabdi runs in day time so noo comparison bro
Translate to English
Translate to Hindi

8945 views
0

Dec 11 2016 (10:54)guest
Re# 2086530-25              
But It Will be not under Slower Average Speed Running Shatabdi as it has got 60 Kmph Capacity
Translate to English
Translate to Hindi

8494 views
0

Dec 11 2016 (11:00)guest
Re# 2086530-26              
@2086530-25  @guest
And Shatabdi is Taking Much Lesser Capacity Section at Last Simaluguri Sibsagar Moranhat Dibrugarh without compromising speed n time
And Day Time Rajdhani don't travel to block the path
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy