Search Forum
Blog Entry# 2091506
Posted: Dec 15 2016 (12:03)
10 Responses
Last Response: Dec 17 2016 (18:42)
10 Responses
Last Response: Dec 17 2016 (18:42)
Commentary/Human Interest
SWR/South Western
Rang De Basanti^ 138872 news posts
The Commissioner of Railway Safety (Southern Circle), Bengaluru, will conduct statutory inspection and speed trial run, between Rayadurga and Kalyanadurga stations of Tumakuru - Rayadurga new...
5 Posts
Whole rayadurga -kalyandurga -tumkuru new rly line is under swr ..scr has no role in this project
OOps. Mistake. Mixed up with AP and Kar. Work was not able to start in Kar due to land acquisition problems.
As per u Sbc - Gtl branch line means new line should be rayadurg - Gtl via uravakonda