Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Vaishali Express - जितना सुंदर तुम्हारा नाम उतनी सुंदर तुम्हारी चाल - be my valentine - Rahul Vatsa

Search Forum
<<prev entry    next entry>>
Blog Entry# 2102196
Posted: Dec 23 2016 (21:55)

21 Responses
Last Response: Jan 05 2017 (00:25)
General Travel
36320 views
22

★★★
Dec 23 2016 (21:55)   12670/Ganga Kaveri Express (PT) | JBP/Jabalpur (7 PFs) | ET/WDP-4B
~   642 blog posts
Entry# 2102196            Tags   Past Edits
#ETALDELECTRIFICATION
In a nutshell, I've closely identified the progress of electrification work between Jabalpur and Itarsi. The details are given below.
1. Jabalpur (excl.)-Narsinghpur work is almost done. Wiring is complete. Work left is only on the two bridges over Narmada river. I think they are deciding to electrify KEQ-JBP at the end. Pic is given in my trip blog.
2. The pic
...
more...
no. 1 & 2 gives the good news we all have been waiting for. The final section i.e, Kareli-Pipariya work has started. Holes have been dug from Gardarwara till Pipariya. You can see works-man digging holes for poles. Soon they'll reach Kareli.
3. Pipariya station is completely under wires now. Pics 3,4,5 shows the status. Wiring from PPI-BGRT is done. At few poles it is to be tightened. I've seen works-man tighten the wires, but due to immense speed of the train (thanks to ET shed monster WDP4b :p ) i couldn't capture those instants. Pics- 8,9 shows BRGT station status.
4. The only single line section of ET-ALD route i.e, BRGT-SQL has also begun to come under wires. Poles and wires are installed and only tightening needs to be done. Pics 9,10,11 are evident. Even bridge over TAWA river is getting poles to be installed.
5. The section after SQL is completed. Only tightening of wires is left at 4-5 poles.
Work is going on at decent pace. CORE is all set to trail the electrified section of ET-PPI in January and is working on that. I hope that was useful :)

Translate to English
Translate to Hindi

19 Posts

18231 views
1

Jan 04 2017 (23:42)
Mohammad Sharique Siddiqui   47 blog posts
Re# 2102196-20              
Very happy to see that the work is restarted hope it finishes soon
Translate to English
Translate to Hindi

18104 views
0

Jan 05 2017 (00:11)
~   642 blog posts
Re# 2102196-21              
70% ho gya?
Translate to English
Translate to Hindi

18295 views
2

Jan 05 2017 (00:25)
Dayodaya superfast express   122 blog posts
Re# 2102196-22              
Yes bro aj hi dayodaya express sey jaipur se lauta hu tab mainey dekha hai70na sahi par 60percent to done hai
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy