It is very annoying that ...maximum time this train departs PNBE Right time but fails to maintain punctuality till JHD. The schedule has been made agressive but never done that.
The 2nd linked point is that i have seen a post that in PNBE- GAYA section y the train running slow even after double electrified line? And answer give by danapur division is of unmanned railway crossing. Ye this one is right but till from double electrification no any steps has been taken by division to sort out this problem. Now a days the accidents at unmanned railway crossings has been drastically increased. The complete negligence And failure of Danapur Division.
The 2nd linked point is that i have seen a post that in PNBE- GAYA section y the train running slow even after double electrified line? And answer give by danapur division is of unmanned railway crossing. Ye this one is right but till from double electrification no any steps has been taken by division to sort out this problem. Now a days the accidents at unmanned railway crossings has been drastically increased. The complete negligence And failure of Danapur Division.
Itna traffic & speed to single line PE bhi manage kiya ja dakta tha...to for doubling ka fayda kya hua ?
Day before yesterday Barkakana bound Palamu express engine rammed into a Tata indigo car near Chakand at an unmanned crossing These types of accident have restricted speed in PG section.
yes the accidents increased now a days but no any steps has been taken by danapur division since it got doubled....it is not only matter of train speed but the people crossing tracks at unmanned railway crossing are also not safe.
32 intermediate stations hai 100 km ke section me kaha se speedup hogi train . Yeh haal poora mgs to pnbe , Ara-ssm and P-G section me hai . ECR ko kya jarurat hai har 3-4 km me ek halt banane ko .