Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

WAP-7 - दिल तुझपे कुर्बान

Search Forum
<<prev entry    next entry>>
Blog Entry# 2151388
Posted: Feb 04 2017 (15:08)

12 Responses
Last Response: Jan 11 2018 (22:42)
1 Followers
Poll
42706 views
32 votes
0

Feb 04 2017 (15:08)   DDL/Dhandari Kalan (3 PFs)
IndianTrainFanonTwitter~
IndianTrainFanonTwitter~   10340 blog posts
Entry# 2151388            Tags   Past Edits
According to you what will be the time of launching for the Dedicated Eastern Freight Corridor (EDFC) which is a Flagship Project for the Narendra Modi Government just like WDFC or ADI-BCT Route Bullet Train Corridor ?
Translate to English
Translate to Hindi
NO vote
On time (Oct. 2019)
6%
2
Before time (March. 2019)
9%
3
Will skip the set deadline (probably before the 2019 Indian General Elections)
84%
27
Add your comment through blog
0%
0

7 Posts

31132 views
2

Feb 05 2017 (07:42)
madanmohanmeena^~
madanmohanmeena^~   15465 blog posts
Re# 2151388-8              
DFC me alag parellel double track bichhaya jaega .jisme sirf Freight trains pass hongi .
Small stations par inme koi bhi connectig point nahi hoga. Only major stations par hi ye interconnected rahengi.
Jin villages stations ke pas track ke jagah nahi waha inhi tracks ko bypass ke jaisa nikala ja rha taki jyada destruction na ho. Overbridge and underpass itne banaye jayenge taki fatal nahi banana pade.
Translate to English
Translate to Hindi

31592 views
1

Feb 05 2017 (12:51)
IndianTrainFanonTwitter~
IndianTrainFanonTwitter~   10340 blog posts
Re# 2151388-9              
Yes, I remember. The then RM Mr. Lalu had announced about the DFC concept in the 2006 IR Budget. It was supposed to be ready for freight train operations by 2008. But this flagship project of IR went into cost overruns due to immense delays as work went on a snail's place. Just around 1+ Kms of track work was completed between Dehri-On-Sone and Durgauti (Durgawati). Let's see when the constructed tracks between Dehri-On-Sone and Kanpur get operational. Successful trials of a WAG-9 hauled freight train have taken place some months back between Dehri and Sasaram I suppose (DFC FB Page also has its pic)... :)
Translate to English
Translate to Hindi

31470 views
2

Feb 05 2017 (13:11)
IndianTrainFanonTwitter~
IndianTrainFanonTwitter~   10340 blog posts
Re# 2151388-10              
You are right. There are some things that I've gone through on IRI through members' blog posts, news items, etc. regarding EDFC as follows:-
.
1) IR is trying to work on straightening of platforms at stations like Mirzapur along with the tracks (both loop and escape lines) to remove PSR. Track renewal work at GMO was also heard about to finish PSR of 30 Kmph & upgrade trains' MPS to 130 Kmph (For AC) and 110 Kmph (For Non-AC).
.
...
more...

2) IR wants to make the entire Howrah - Gaya - Mirzapur - Kanpur - Delhi Route 100% free of manned/unmanned level crossing gates and work seems to have been started in the 1st phase between Mughalsarai and Ghaziabad through ROB/FOB constructions to remove TSR. FOB construction work at GMO is also pending to finish PSR of 30 Kmph & upgrade trains' MPS to 130 Kmph (For AC) and 110 Kmph (For Non-AC).
.
3) IR plans to replace Manual Signalling with Automatic Block Signalling System (ABSS) between Allahabad and Kanpur for better train movement.
.
4) All the above points are meant to synchronize present HWH-GAYA-MZP-NDLS Old Tracks with parallel EDFC Modern tracks between Dankuni Jn and Khurja Jn. Abhishek Jaiswal Sir on IRI told me that signalling work on ALD-CNB stretch is left while its tracks won't be shared with platforms of stations like Hathras Jn, Tundla Jn, Aligarh Jn, Khurja Jn, etc. en route. So freight and passenger trains may use EDFC tracks if they have a Non-Stop MGS-ALD or ALD-CNB Run :)

Translate to English
Translate to Hindi

28655 views
1

Jan 10 2018 (14:21)
ankit0507~
ankit0507~   2073 blog posts
Re# 2151388-11              
after 2019
Translate to English
Translate to Hindi

28250 views
1

Jan 11 2018 (22:42)
A2Z~
A2Z~   17505 blog posts
Re# 2151388-12              
* DFC is a very old concept world wide, many DFCs were operational in many countries. Due to the industrial boom, IR was getting bumper incremental loading, IR decided to go for construction of DFCs in 2006 to meet the future loadings.
* Minimum of 4-5 yrs are required for construction of a corridor, announcing DFC in 2006 and planning to operate trains in 2 yrs is impractical. Practically the announcement mostly remained on papers and actual work was very slow.
* During the tenure of Mr Prabhu, contract awarding & construction
...
more...
work picked up speed.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy