Search Forum
Blog Entry# 2168074
Posted: Feb 17 2017 (15:31)
3 Responses
Last Response: Feb 22 2017 (14:33)
3 Responses
Last Response: Feb 22 2017 (14:33)
Mumbai CSTM platform number 10 to 13 extension works have to be taken up.
Major trains such as,
Mumbai expresses, Mumbai Mail and Dadar Expresses are all operated with a meagre 18 coaches between these two Metros.
Requested Central Railway that these train operation have to be shifted to Mumbai LTT so as all these can be operated...
more...
Major trains such as,
Mumbai expresses, Mumbai Mail and Dadar Expresses are all operated with a meagre 18 coaches between these two Metros.
Requested Central Railway that these train operation have to be shifted to Mumbai LTT so as all these can be operated...
more...
Even if CSTM's platforms are extended, Dadar Express cannot be made 24-coacher because it departs from Dadar (DR) station which has no space for any PF extension.
Dadar express also has to be shifted to LTT to attach 24 coach train.