Mumbai CSTM platform number 10 to 13 extension works have to be taken up.
Major trains such as,
Mumbai expresses, Mumbai Mail and Dadar Expresses are all operated with a meagre 18 coaches between these two Metros.
Requested Central Railway that these train operation have to be shifted to Mumbai LTT so as all these can be operated...
more...
Major trains such as,
Mumbai expresses, Mumbai Mail and Dadar Expresses are all operated with a meagre 18 coaches between these two Metros.
Requested Central Railway that these train operation have to be shifted to Mumbai LTT so as all these can be operated...
more...
1 Public Posts - Fri Feb 17, 2017
Dadar express also has to be shifted to LTT to attach 24 coach train.