at a time AF , one LC possible. prob is this. either AF AII full electrify ho jaye , so that 5 mins halt & leave the PF, else this delay cant be reduced.
12988 blocked the PF, then Marudhar, obviously 1 hr it had to wait.
12988 blocked the PF, then Marudhar, obviously 1 hr it had to wait.
Electrification is easy and can be done in 2 years but doubling is verry difficult
AF BKI single electrifed & BKI AII Double electrify can also help .
AH BKI Doubling is planned already.
AH BKI Doubling is planned already.