SWR/South Western
HAREESHMANGALAM~ 1194 news posts
Bengaluru-Hassan rail line took 21 years to be completed and cost almost Rs 1,300 crore, three times the cost of launching ISRO's Mars mission
One...
One...
read more... Going to Mars was way, way cheaper
2 Public Posts - Tue Feb 21, 2017
2 Public Posts - Wed Feb 22, 2017
6 Public Posts - Thu Feb 23, 2017
My mistake, 'random' was probably not a very good choice of words here. :)
I meant that the engineering restrictions for roads and road vehicles are somewhat more relaxed than that of train routes. Curves can be banked, and larger gradients can be dealt with more effectively than that of a railway track where no such flexibility exists. Roads can be banked to higher angles, and can deal with much larger gradients easily while still maintaining the high speed requirements. So, minor realignments etc are technically as problematic for roads as they are for rails.
...
more...
I meant that the engineering restrictions for roads and road vehicles are somewhat more relaxed than that of train routes. Curves can be banked, and larger gradients can be dealt with more effectively than that of a railway track where no such flexibility exists. Roads can be banked to higher angles, and can deal with much larger gradients easily while still maintaining the high speed requirements. So, minor realignments etc are technically as problematic for roads as they are for rails.
...
more...