एकीकृत दृष्टिकोण1रेलवे बोर्ड के एक अधिकारी ने बताया कि पहली बार इन दोनों परियोजनाओं के क्रियान्वयन के लिए केंद्रीयकृत और एकीकृत एप्रोच अपनाई जा रही है।...
Firstly triple over the track of ALD MGS route via MZP.
Or either double and electrify ALD-GYP-BSB route.
These things are only on cards but the position will remain same forever or even get worse than this.
Or either double and electrify ALD-GYP-BSB route.
These things are only on cards but the position will remain same forever or even get worse than this.
Triple nahi whole MGS Delhi route quadruple chahiye
DEL-MUM, DEL-KOL can be done in about 7 hrs if operating speed is 300kmph i.e by HST only
200 kmph train can do it in about 10 hrs.
160kmph train can do it in about 12 hrs
160kmph/12hrs option is feasible after completion of the DFCs & upgradation of existing tracks
200 kmph train can do it in about 10 hrs.
160kmph train can do it in about 12 hrs
160kmph/12hrs option is feasible after completion of the DFCs & upgradation of existing tracks
Hindi News waale News ko twist kartna acche se jaante hai. Budget me saaf likha hai ki route ki MPS 160-200 kerna hai, kahi nahi likha hai ki ye average speed hogi.