Now from MFP to KIR route is completely electrified(distance 283KM, 6 hours running) so now i think it should get eloco in that section that can be WAP-4 of MGS shed. although it has 12 minutes stoppage at KIR and averagely reaching 10-15 before schedule in both up & down journey, so there is enough time to exchange loco. Then between KIR to HWH section it can use dloco of shed SGUJ/MLDT/HWH. Now only KIR to PKR part need to get electrified then it would get eloco E2E. From now it would be better if it gets eloco from MFP to KIR.
5 Public Posts - Thu Mar 23, 2017
More Hectic.
Train goes to Howrah and will have Loco change also at Howrah only.
Thus Howrah shed is more feasible, Practical and Possible.
MGS is ECR shed and they won't prefer sending their Loco all the way from MGS to MFP to HWH.
That...
more...
Train goes to Howrah and will have Loco change also at Howrah only.
Thus Howrah shed is more feasible, Practical and Possible.
MGS is ECR shed and they won't prefer sending their Loco all the way from MGS to MFP to HWH.
That...