Search Forum
Blog Entry# 2208890
Posted: Mar 24 2017 (11:13)
18 Responses
Last Response: Mar 25 2017 (11:24)
18 Responses
Last Response: Mar 25 2017 (11:24)
lhb rake should be given first of all only to those sf /m/exp running on sections with atleast 110 mps
1 Public Posts - Fri Mar 24, 2017
All the LHB coaches should be given to all the 130kmph fit sections on priority and operated at 130kmph on shadow slots just behind the existing Raj/Shat/Duro/GR trains.
This will ensure 130kmph operation of large number of SF trains in IR. Avg speed of SF trains shall increase drastically from current 55/65 kmph range to 70/85 kmph range depending on the no. of stops and route.
Presently there are mainly 3 130kmph routes connecting the national capital NDLS-MUM/ HWH/ MAS.
After...
more...
This will ensure 130kmph operation of large number of SF trains in IR. Avg speed of SF trains shall increase drastically from current 55/65 kmph range to 70/85 kmph range depending on the no. of stops and route.
Presently there are mainly 3 130kmph routes connecting the national capital NDLS-MUM/ HWH/ MAS.
After...
more...
12 Public Posts - Fri Mar 24, 2017
4 Public Posts - Sat Mar 25, 2017