Blog Entry# 2209024
Posted: Mar 24 2017 (12:50)

8 Responses
Last Response: Mar 24 2017 (19:15)
Rail News
6754 views
1

New Facilities/Technology
Mar 24 2017 (10:15)   To boost fare revenue, Indian Railways may allow private passenger trains to use its tracks once DFCs become operational

A2Z~   12817 news posts
Entry# 2209024   News Entry# 297431         Tags   Past Edits
To accelerate its eroding fare revenue, the Indian Railways (IR) plans to allow private passenger trains, luxury trains and container operators to use its existing tracks...

3 Posts

4277 views
0

Mar 24 2017 (17:19)
A2Z~
A2Z~   17505 blog posts
Re# 2209024-4              
POWs, Deccan Odyssey etc are ultimate luxury & high end tourist trains giving almost 5 star facility with cabins. Today Maharaja Express operates between Mumbai & Delhi in addition to other destinations.
The proposed pvt trains are supposed to be meant for travellers & not tourists, they may be SF or faster/premium fully ac trains with better facilities or may be high volume all ac fast trains with reasonable fares.
-
I
...
more...
expect Pvt sector definitely to come with a real cheap ac travel with fare just 2 times od SL travel through innovative design of coaches, subject to condition that IR does not charge abnormally high haulage charges from private operators. Past experience of container train operators had not been very good for pvt operators. Independent regulator have to play a constructive role for successful involvement of pvt sector.

Translate to English
Translate to Hindi

3913 views
0

Mar 24 2017 (17:35)
SingleTraveller^~
SingleTraveller^~   3246 blog posts
Re# 2209024-5              
DFCs commissioning itself may take decades. Idea mooted in 2005 (?), very little progress till date.
Translate to English
Translate to Hindi

3935 views
0

Mar 24 2017 (17:48)
A2Z~
A2Z~   17505 blog posts
Re# 2209024-6              
Commissioning shall not take so long as all the major contracts for construction of WDFC (1500kms+) have already been awarded to contractors and about 92% contracts for EDFC (Ludhiana-Sonnagar 1300+km) have been awarded.
It is expected that that above shall be fully commissioned in phases 3-5 years.(although the target is yr 2019/20 which is likely to be extended by an year or two)
For other 4 DFCs planned it will take much longer as funds have not been arranged for the same.
Translate to English
Translate to Hindi

3564 views
0

Mar 24 2017 (19:06)
SingleTraveller^~
SingleTraveller^~   3246 blog posts
Re# 2209024-7              
They are building tracks at a very slow rate. Even at 100 Kms per year it will be a decade. Zones build some 50 Kms of new track every year and commission them in March to show target met.
Translate to English
Translate to Hindi

3939 views
0

Mar 24 2017 (19:15)guest
Re# 2209024-8              
DFC takes 10-15 years
5 years for full planning
And then 10 years for construction.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy