electric engine trial run completed between guntakal - dhone....yesterday guntakal elec chief engineer inspected the route....so they may run upto guntur if total line is completed the inspection.
41 Posts
i think no...becz it needs atleast 10mins for loco change which is difficult at that time @dhone having only 3pfs
They do it all the time, I travelled in Guntur guntakal passenger. They have done lot of times.
there is no gtl -gnt psgr that train is terminated @dhone itself
Secunderabad Guntur passenger changes direction at dhone daily I think we have two passengers daily.